Index of /NASA
Name Last modified Size Description
Parent Directory -
2019-04-29 PMR 1st Q 2019/ 2019-09-13 12:19 -
2019-07-30 PMR 2nd Q 2019/ 2019-09-13 12:19 -
0_NASA Index.pdf 2019-11-20 11:25 719K
1994-09-15 Post closure care permit.pdf 2022-03-07 10:30 8.2M
1995-07-11 Permit modification request.pdf 2022-03-07 10:56 15M
2001-10-30 Position Paper - Use of Low Flow and other Nontraditional Sampling.pdf 2015-08-04 14:40 245K
2003-10-31 NOD Permit Renewl App.pdf 2013-04-25 23:31 4.9M
2006-10-01 TPH screening guidelines.pdf 2013-11-14 21:27 221K
2009-08-01 Technical Background Document for Soil Screening Levels Rev 5.0.pdf 2015-09-17 09:32 1.2M
2011-12-16 Approval with Mods IR for Eval the Representativeness of GW Samples Collected from westbay wells.pdf 2016-05-11 15:35 218K
2012-04-24 Approval Abbreviated IWP for SWMU 10 Soil Removal.pdf 2019-08-27 09:32 63K
2012-06-14 -- 600 Area SVE Pilot Test IR.pdf 2017-07-11 08:13 6.5M
2012-06-19 Soil Background Study IWP.pdf 2019-08-27 09:39 10M
2012-08-17 Disapproval Soil Background Study IWP.pdf 2019-08-27 09:42 128K
2012-08-28 Disapproval 600 Area SVE Pilot Test IR.pdf 2017-07-11 08:08 119K
2012-09-12 NOD Response 600 Area SVE Pilot Test IR.pdf 2017-07-11 08:11 13M
2012-09-17 NOD Response to Soil Background Study.pdf 2019-08-27 10:03 19M
2012-09-28 Approval 600 Area SVE Pilot Test IR.pdf 2017-07-11 08:06 43K
2012-09-28 Approval Soil Background Study IWP.pdf 2019-08-27 10:04 49K
2012-10-05 Abbreviated IR for SWMU 10 Soil Removal.pdf 2019-08-27 10:08 11M
2013-01-16 Approval Abbreviated IR for SWMU 10 Soil Removal.pdf 2019-08-27 10:25 60K
2013-03-12 Abbreviated IR Addendum for SWMU 10 Soil Removal.pdf 2019-08-27 10:41 2.6M
2013-03-20 Approval Abbeviated IR Addendum for Additional SWMU 10 Soil Removal.pdf 2019-08-27 10:27 60K
2014-03-27 Soil Background Study IR.pdf 2019-08-27 10:47 109M
2014-04-14 Notice of Violation & Resolution.pdf 2014-07-01 15:26 110K
2014-06-26 NOD Soil Background Study IR.pdf 2019-08-27 10:48 102K
2014-07-30 SWMUs 1, 3 & 5 IWP & Historical Information Summary.pdf 2019-08-27 11:18 39M
2014-08-27 Approval No Longer Contained In IDW 200 Area Phase 2.pdf 2019-08-27 11:02 69K
2014-08-27 NOD Response Soil Background Study IR.pdf 2019-08-27 11:05 1.0M
2014-09-05 Approval with Mods SWMUs 1, 3 & 5 IWP.pdf 2019-08-27 11:07 104K
2014-10-09 Response to Approval with Mods SWMUs 1, 3 & 5 IWP.pdf 2019-08-27 11:14 3.0M
2014-10-15 -- 2nd NOD Soil Background Study IR.pdf 2019-08-27 11:20 115K
2014-12-17 Initiated IM at SWMUs 29-31.pdf 2019-08-27 11:26 74K
2014-12-17 Response to 2nd NOD Soil Background Study IR.pdf 2019-08-27 11:23 903K
2015-02-19 Approval with Mods Soil Background Study IR.pdf 2019-08-27 11:31 218K
2015-02-25 Notice of Violation & Resplution.pdf 2015-02-25 15:45 64K
2015-02-26 Small Arms Firing Ranges SWMU 29-31 ACM WP &Historical Info Summary.pdf 2019-08-27 11:42 71M
2015-05-13 Soil Background Study IR Revised.pdf 2019-08-27 11:48 109M
2015-05-29 Approval with Mod Small Arms Firing Ranges SWMUs 29-31 ACM WP.pdf 2019-08-27 11:50 87K
2015-08-11 Disapproval Soil Background Study IR.pdf 2019-08-27 11:52 94K
2015-08-26 NOD Response Soil Background Study IR.pdf 2019-08-27 11:59 109M
2015-09-16 Approval Soil Background Study IR.pdf 2019-08-27 12:01 48K
2015-10-01 -- 2015 Annual Fee.pdf 2015-10-01 09:13 152K
2015-11-23 SWMUs 1, 3 & 5 IR.pdf 2019-08-27 12:04 24M
2016-03-08 NOV.pdf 2016-03-09 08:39 94K
2016-03-08 Status Update Small Arms Firing Ranges SWMUs 29-31 ACM.pdf 2019-08-27 12:22 34M
2016-05-11 Approval with Mod Status Updte Smal Arms Firing Range SWMUs 29-31.pdf 2019-08-27 12:26 95K
2016-05-24 Approval with Mods SWMUs 1, 3 & 5 IR.pdf 2019-08-27 12:27 154K
2016-08-30 Response to Approval with Mods SWMUs 1, 3 & 5 IR.pdf 2019-08-27 12:36 33M
2016-10-03 -- 2016 Annual Fee.pdf 2016-11-16 14:32 261K
2017-03-30 Remedy Completion Report SWMUs 29-31.pdf 2019-08-27 12:47 31M
2017-09-07 Disapproval Small Arms Firing Ranges SWMUs 29-31 Remedy Completion Rpt.pdf 2019-08-27 12:49 420K
2017-10-03 -- 2017 Anual Fee.pdf 2017-11-02 12:54 241K
2017-10-30 Periodic Monitoring Rpt - 3rd Q 2017.pdf 2017-11-29 12:18 65M
2017-11-08 Monthly Environmental Activity Report for October 2017.pdf 2017-11-29 12:05 201K
2017-11-09 Fee Assessment 400 Area Well copletion summary Rpt.pdf 2017-11-08 10:54 97K
2017-11-30 Fee Assessment PMR for 3rd Q 2017.pdf 2017-11-28 11:31 95K
2018-01-12 Fee Assessment 200 Area Haz Wate Transmission Lines IR SWMU 10.pdf 2018-01-16 15:57 100K
2018-01-23 Fee Assessment 100 Area Wastewater Lagoons.pdf 2018-01-22 09:36 97K
2018-01-23 Fee Assessment 200 Area Wastewater Lagoons.pdf 2018-01-22 09:39 100K
2018-02-07 Fee Assessment 400 Area Closure IR.pdf 2018-02-06 16:58 96K
2018-02-07 Fee Assessment SWMU 49, 700 Area Landfill Phase 1 IWP.pdf 2018-02-06 16:55 99K
2018-02-07 Fee Assessment Well Reconfiguration WP for Well BLM-30.pdf 2018-02-06 16:57 97K
2018-02-07 Fee Assessment WP for Abandonment of Well PL-5.pdf 2018-02-06 16:09 100K
2018-03-30 NOD Response Small Arms Firing Ranges SWMUs 29-31 Remedy Completion Rpt.pdf 2019-08-27 15:51 55M
2018-06-07 Fee Assessment GW Monitoring Plan.pdf 2018-07-27 07:51 197K
2018-06-07 Fee Assessment Interim Status Rpt for 600 Area Perched GW.pdf 2018-07-27 07:50 207K
2018-06-07 Fee Assessment PMR for 1st Q 2018.pdf 2018-07-27 07:48 212K
2018-07-11 Augemented Soil Background Study Abbreviated IWP.pdf 2019-08-27 15:56 6.9M
2018-08-29 Fee Assessment Augmented Soil Background Study Abbreviated IWP.pdf 2018-08-24 08:20 101K
2018-08-29 Fee Assessment PMR for 2nd Q 2018.pdf 2018-08-24 08:21 135K
2018-09-19 Fee Assessment Abbreviated IWP for Test Stand 301A.pdf 2018-09-19 08:39 137K
2018-09-19 Fee Assessment Remediation System Monitoring Plan.pdf 2018-11-15 16:13 173K
2018-10-05 -- 2018 Annual Fee.pdf 2018-11-15 16:20 518K
2018-10-15 Fee Assessment 500 Area fuel Stoarge IWP SWMU 47.pdf 2019-01-16 07:36 199K
2018-10-15 Fee Assessment Wastewater Lagoon Sludge Disposal Plan.pdf 2018-10-16 08:33 104K
2018-10-30 PMR 3rd Quarter 2018.pdf 2019-02-14 09:09 245M
2018-11-09 Fee Assessment Class 1 Permit Mod Request Fuel Treatment Unit.pdf 2019-01-16 07:40 184K
2018-11-30 Fee Assessment 200 Area Wastewater Lagoons Liner.pdf 2018-11-27 15:56 219K
2018-11-30 Fee Assessment 600 Area Wastewater Lagoons Liner.pdf 2018-11-27 15:59 171K
2018-11-30 Fee Assessment PMR for 3rd Q 2018.pdf 2018-11-27 15:37 168K
2018-11-30 Fee Assessment Targeted Mobile Remediation Process Pilot WP.pdf 2018-11-27 15:52 162K
2019- 10-08 Approval w Mods STGT Wastewater Lagoons Liner.pdf 2019-10-08 13:02 159K
2019-01-30 Fee Assessment Abbreviated IWP GW Data.pdf 2019-03-21 14:25 130K
2019-02-21 -- 2nd Disapproval Small Arms Firing Ranges Remedy Completion Rpt.pdf 2019-08-27 16:04 175K
2019-03-20 Fee Assessment Mid Plume Fracture Enhancement Pilot Test WP.pdf 2019-05-01 11:25 118K
2019-03-20 Fee Assessment PMR for 4th Q 2018.pdf 2019-05-01 11:26 120K
2019-03-20 Fee Assessment Test Stand 301A Abbreviated IR.pdf 2019-05-01 11:26 101K
2019-03-27 isapproval Augmented Soil Background Study Abbrev. IWP.pdf 2019-08-27 16:09 111K
2019-04-12 Fee Assessment 1st TDRSS Diesel Release SWMU 50 IR.pdf 2019-05-30 17:05 1.0M
2019-04-26 Targeted Mobile Remediation Process Pilot Test WP.pdf 2019-09-13 09:30 9.8M
2019-04-30 GW Monitoring Plan Update 2019.pdf 2019-09-13 09:24 8.5M
2019-05-29 -- 100 Area Wastewater Lagoons Closure Interim Status Rpt.pdf 2019-09-13 09:11 374M
2019-05-30 Contingency Plan Annual Update.pdf 2019-09-13 09:22 1.3M
2019-05-31 Fee Assessment GW Monitoring Plan.pdf 2019-07-10 08:00 175K
2019-05-31 Fee Assessment Interim Status Rpt 600 Area GW Extraction Pilot Project Y6.pdf 2019-05-29 15:07 148K
2019-05-31 Fee Assessment PMR for 1st Q 2019.pdf 2019-07-10 08:00 180K
2019-05-31 Fee Assessment Site Wide Geophysical Survey IWP.pdf 2019-07-10 08:01 182K
2019-06-05 Permit Renewal Application.pdf 2019-09-13 09:27 16M
2019-06-24 Response to Disapproval Augmented Soil Background Study IWP.pdf 2019-08-27 16:12 1.5M
2019-06-27 Response to Disapproval Revised SWMU 19 IR.pdf 2019-09-13 08:51 91M
2019-07-03 Fee Assessment 400 Area Supplemental GW & Soil Vapor Monitoring Plan.pdf 2019-10-09 14:08 504K
2019-07-03 Fee Assessment 100 Area Wastewater Lagoons Closure SWMU 2 Interim Status Report.pdf 2019-08-15 07:34 473K
2019-07-03 Fee Assessment 300 Area Supplemental Abbrivated Drilling WP.pdf 2019-08-15 07:33 442K
2019-07-19 PL-12 Monitoring Well Design.pdf 2019-07-23 13:17 1.5M
2019-07-30 Remediation System Monitoring Plan Annual Update 2019.pdf 2019-09-13 08:36 5.8M
2019-07-30 Response to Disapproval 200 Area HWTL IR SWMU 10.pdf 2019-09-13 08:46 104M
2019-08-06 Closure Certification Rpt 500 Area Fuel Treatment Unit.pdf 2019-09-13 08:33 37M
2019-08-08 Response to Approval w Mods SWMU 49 Phase 1 IWP.pdf 2019-09-13 08:53 9.2M
2019-08-19 Fee Assessment Closure Certification Rpt 500 Area.pdf 2019-08-15 07:35 140K
2019-08-19 Fee Assessment Interim Status Rpt for Targeted Mobile Process.pdf 2019-09-18 11:18 188K
2019-08-19 Fee Assessment Remediation system Monitoring Plan.pdf 2019-08-15 07:38 139K
2019-08-19 Fee Assessment STGT Wastewater Lagoons Liner.pdf 2019-08-15 07:41 139K
2019-08-19 PMR for 2nd Q 2019.pdf 2019-08-15 07:37 140K
2019-09-03 Approval Interim Status Rpt for 600 Area Perched GW.pdf 2019-09-03 13:53 89K
2019-09-16 Disapproval 400 Area Closure IR.pdf 2019-09-17 07:30 286K
2019-09-20 Fee Assessment WP for Abandonment of Well BLM-30.pdf 2019-09-18 16:42 142K
2019-10-01 NASA WSTF Hazardous Waste Permit - Modified October 2019.pdf 2020-01-24 11:42 3.6M
2019-10-04 -- 2019 Annual Fee.pdf 2019-11-05 13:47 622K
2019-10-07 Approval Extension Request for NOD Response 200 & 600 Areas.pdf 2019-10-08 07:23 88K
2019-10-07 Approval w Mods Site Wide Geophysical Survey IWP.pdf 2019-10-08 07:22 220K
2019-10-08 Approval Request Contained In Determination Drill Cuttings.pdf 2019-10-08 13:05 173K
2019-10-08 Disapproval 600 Area BLM Off Site Pile Revised IR SWMU 16.pdf 2019-10-08 13:04 211K
2019-10-11 Approval extension rqst-BLM-42 and PL-12 Well Completion Rpts.pdf 2019-10-11 08:54 87K
2019-10-22 Approval Request for Contained In Determination Well BLM-30.pdf 2019-10-22 13:39 194K
2019-10-22 Approval Request for Contained In Determination Well PL-12.pdf 2019-10-22 13:37 215K
2019-10-31 Notification of Class 1 Modification without Prior Approval - Update Attachment 3 - Contingency Plan WSTF.pdf 2019-11-04 09:17 1.3M
2019-11-13 -- 15 Day Notification of a Newly Identified SWMU.pdf 2019-11-13 14:39 88K
2019-11-13 Approval Extension Request for Response to 2nd Disapproval Remedy Completion Rpt.pdf 2019-11-13 14:38 86K
2019-11-14 Monthly Environmental Activity Report - October 2019.pdf 2019-11-18 13:55 155K
2019-12-06 Request for Second Extension of Time for Well Reconfiguration Work Plan.pdf 2019-12-12 15:30 85K
2019-12-09 WSTF Monthy Environmental Activity Rtp - Nov 2019.pdf 2019-12-10 12:24 288K
2019-12-11 Approval_Remediation System Monitoring Plan.pdf 2019-12-11 08:40 192K
2019-12-12 Approval w Modifications Groundwater Monitoring Plan.pdf 2019-12-12 15:33 153K
2019-12-12 Approval with mods. PMR First Quarter 2019.pdf 2019-12-12 15:36 104K
2019-12-12 Approval with mods. Response to Disapproval PMR Fourth Quarter 2018.pdf 2019-12-12 15:34 221K
2019-12-12 Response to Approval with Modifications for Site-wide Geophysical Survey Investigation Work.pdf 2019-12-13 14:52 93M
2019-12-17 Request for Second Extension of Time for Response to Disapproval 200 Area and 600 Area Vapor Intrusion Assessment rpt.pdf 2019-12-18 12:46 932K
2019-12-18 600 Area Bureau of Land Management Off-Site Soil Pile.pdf 2019-12-20 09:20 59M
2019-12-18 Disapproval Mid-Plume Fracture Enhancement Pilot Test Work Plan.pdf 2019-12-18 11:00 527K
2019-12-19 Synopsis of the Findings of the 600 Area Closure Geophysical Seismic Refraction Tomography and Reflection Surveys w Revised Soid Boring Locations.pdf 2019-12-20 13:27 53M
2019-12-30 NASA WSTF 400 Area Closure Investigation Report - NMED 2nd Disapproval Response.pdf 2020-01-02 12:47 1.0G
2020-01-13 WSTF Monthly Environmental Report for December 2019.pdf 2020-01-15 11:48 2.0M
2020-01-14 NASA WSTF 2020 Soil Vapor Risk Based Concentrations (RCB) Memorandum.pdf 2020-01-21 14:06 3.0M
2020-01-15 Response to Approval with Modifications of NASA WSTF Periodic Monitoring Report - 4th Q 2018.pdf 2020-01-21 13:59 72M
2020-01-16 Approval_Request for 2nd Extension of Time for Response to Disapproval 200 Area and 600 Area Vapor Intrusino Assessment Report.pdf 2020-01-21 14:27 52K
2020-01-16 Approval_Request for Extension of Time for Well Reconfiguration Work Plan.pdf 2020-01-21 14:29 61K
2020-01-22 Public Notice of a Class 1 Hazardous Waste Permit Modification.pdf 2020-01-28 10:49 57K
2020-01-22 Response to Approval w Modification of NASA WSTF Periodic Monitoring Report - 1st Q 2019.pdf 2020-01-24 12:36 63M
2020-01-29 Approval_Interim Status for Targeted Mobile Remediation Process Project Year One.pdf 2020-01-28 14:40 58K
2020-01-29 NASA WSTF Annual Waste Accumulation Areas Location Map.pdf 2020-01-31 15:42 2.4M
2020-01-29 NMED Response for 200 Area and 600 Area Vapor Intrusion Assessment Report.pdf 2020-02-03 14:30 145M
2020-01-29 Second Request for Extension of Time for NASA WSTF Small Arms Firing Ranges (SMWU's 29-31) Response to 2nd Dissapproval Remedy Completion Report.pdf 2020-01-31 12:10 88K
2020-01-30 NASA WSTF Periodic Monitoring Report - 4th Qtr 2019.pdf 2020-02-03 14:07 550M
2020-02-03 Approval w Modifications_Augmented Soil Background Study Abbreviated Investigation Work Plan.pdf 2020-02-04 11:10 180K
2020-02-06 Approval w Mods_NASA WSTF Periodic Monitoring Report_2nd Q 2019.pdf 2020-02-14 15:55 155K
2020-02-06 Third Request for Extension of Time for BLM-42 and PL-12 Well Completion Reports.pdf 2020-02-14 15:53 266K
2020-02-11 Monthly Environmental Activity Report_January 2020.pdf 2020-02-14 13:35 255K
2020-02-12 Groundwater Monitoring Plan Update for 2019.pdf 2020-02-17 14:40 11M
2020-02-17 Approval_3rd Request for Extension of Time for BLM-42 and PL-12 Well Completion Reports.pdf 2020-02-19 15:22 60K
2020-02-21 Approval_Request for Second Extension of Time for NASA WSTF Small Arms Firing Ranges (SWMUs 29-31) Response to Second Disapproval Remedy Completion Report.pdf 2020-02-26 11:37 43K
2020-02-26 NASA WSTF 2019 Biennial Hazardous Waste Report.pdf 2020-02-28 14:32 194K
2020-02-26 Semi-Annual Report for Discharge Permit - 1255 Second Half 2019.pdf 2020-02-28 14:20 385K
2020-03-11 WSTF Monthly Environmental Activity Report for February 2020.pdf 2020-03-19 14:53 240K
2021-04-19 GMP-2021update.pdf 2022-02-24 13:09 9.2M
Server at hwbdocuments.env.nm.gov Port 443