Index of /Sparton
Name Last modified Size Description
Parent Directory -
0_Sparton Index.pdf 2022-06-22 14:38 428K
1983-09-23 Recommendations for Investigations of Soil & GW Contamination.pdf 2017-04-06 08:34 638K
1983-09-28 Surface Impoundment Closure Plan.pdf 2017-04-06 08:38 312K
1983-10-10 Discharge Plan.pdf 2017-04-06 09:03 3.0M
1984-01-17 rqurmnts to cmply with regs.pdf 2013-12-24 08:55 159K
1984-02-08 hazardous waste manifests 11-1980 to 2-1984.pdf 2013-12-27 09:56 5.6M
1984-05-03 Investigation Soil & GW Contamination.pdf 2017-04-06 09:24 2.3M
1984-11-02 memorandum response to issues raised.pdf 2014-01-21 10:39 95K
1985-03-13 Hydrogeologic Characterization & Remedial Investigation.pdf 2017-04-06 10:06 3.6M
1985-04-03 Notice of Violation.pdf 2017-04-06 09:26 67K
1985-05-07 Closure Plan.pdf 2017-04-06 10:53 2.1M
1985-06-14 EID revw of HW clsr plan.pdf 2013-12-24 09:00 121K
1985-09-26 notice of incompleteness.pdf 2013-12-24 09:15 98K
1985-12-19 ponds & drum strg area clsr pln & PCCP.pdf 2017-04-06 12:00 2.7M
1985-12-19 Re Closure Plan & PCCP Submittal.pdf 2013-12-24 10:34 33K
1986-02-17 closure plan modfctn.pdf 2013-12-24 11:00 85K
1986-02-20 Public Notice & Fact Sheet.pdf 2013-12-26 08:22 217K
1986-03-26 phase 1 prelimnry assmnt rpt.pdf 2013-12-26 08:27 968K
1986-03-28 RCRA post-closure prmt app.pdf 2013-12-23 10:48 19M
1986-06-16 closure plan modifications review.pdf 2013-12-26 08:51 81K
1986-06-30 Soil Investigation of the Usaturated & Upper Saturated Zones.pdf 2017-04-06 14:13 2.1M
1986-09-30 Requiring Submittal of an Exposure Information Report.pdf 2017-04-06 13:56 122K
1986-11-17 Certification of Closure.pdf 2017-04-06 13:54 51K
1986-12-18 Certification of Closure.pdf 2017-04-06 13:53 44K
1987-02-27 certification of closure of 3 storage units.pdf 2013-12-26 09:07 110K
1987-04-10 Draft Settlement Agreement.pdf 2017-04-06 12:02 128K
1987-05-18 Concerning Closure of Surface Impoundments.pdf 2017-04-06 12:04 32K
1987-06-10 agreement in principle.pdf 2013-12-26 09:12 200K
1987-06-30 denial of oprtng prmt & trmtn of interim stst.pdf 2013-12-26 09:15 94K
1987-08-11 Post Closure Permit.pdf 2017-04-06 12:05 37K
1987-08-17 apprvl request to begin Cnstrctn.pdf 2013-12-26 09:28 41K
1987-08-21 Upper Flow Zone Cleanup.pdf 2017-04-06 12:05 59K
1987-12-23 air quality permit.pdf 2013-12-26 09:30 115K
1988-03-25 CMS Rpt - letter only.pdf 2013-12-26 11:29 37K
1988-10-01 administrative order.pdf 2013-12-26 13:34 2.4M
1988-11-14 monthly progress report.pdf 2013-12-23 11:33 1.8M
1988-11-29 contamination assesment plan.pdf 2017-03-28 15:27 1.8M
1988-12-06 monthly report.pdf 2013-12-23 12:32 3.8M
1988-12-08 dscrptns of MW-19 MW-20 MW-21 & MW-22.pdf 2013-12-26 11:39 650K
1988-12-20 notice of public informational meeting.pdf 2013-12-26 12:08 85K
1988-12-28 RFI work plan.pdf 2017-03-28 15:31 6.1M
1989-01-06 press release.pdf 2013-12-26 13:45 46K
1989-01-10 public meeting notice.pdf 2013-12-26 14:10 37K
1989-01-27 Initial Draft Post Closure Permit.pdf 2017-04-06 12:09 319K
1989-02-22 settelment check for financial assurance litigation.pdf 2013-12-26 14:18 29K
1989-03-22 HSWA draft permit - letter only.pdf 2013-12-26 15:46 29K
1989-05-23 comphnsv gw mntrng eval.pdf 2013-12-26 15:49 33K
1989-06-09 draft permit - letter only.pdf 2013-12-26 15:51 41K
1989-08-07 analitical parameters.pdf 2013-12-26 16:01 66K
1989-08-31 comphnsv gw mntrng eval.pdf 2013-12-26 16:07 311K
1989-10-16 cmphnsv grndwtr mntrng eval - letter only.pdf 2013-12-26 16:13 38K
1989-11-22 noncompliance of order.pdf 2013-12-26 16:26 38K
1989-11-22 summary of meeting on 10-17-89.pdf 2013-12-26 16:37 107K
1989-11-30 off-site monitoring well spec.pdf 2013-12-26 16:39 40K
1989-12-18 time extnsn apprvl for sbmsn of final RFI rprt.pdf 2013-12-26 16:49 46K
1989-12-21 location map.pdf 2014-01-21 10:33 112K
1990-01-12 monthly report.pdf 2013-12-27 12:27 4.2M
1990-02-14 monthly report.pdf 2013-12-27 13:44 6.0M
1990-02-23 efctvns of gw rcvry well sytm.pdf 2013-12-27 11:19 10M
1990-03-13 monthly report.pdf 2013-12-27 13:57 3.1M
1990-04-04 RCRA RFI interm report.pdf 2017-03-28 17:03 3.6M
1990-04-10 monthly report.pdf 2013-12-27 14:32 165K
1990-06-08 monthly report.pdf 2013-12-27 14:44 2.3M
1990-07-11 monthly report.pdf 2013-12-27 15:07 4.6M
1990-09-14 monthly report.pdf 2013-12-27 15:23 1.1M
1990-09-24 rvw 0f prpsd mntrng well istltn.pdf 2013-12-27 08:10 181K
1990-10-10 monthly report.pdf 2013-12-27 15:36 1.5M
1990-11-08 monthly report.pdf 2013-12-27 15:49 2.2M
1990-12-11 monthly report.pdf 2013-12-27 16:28 3.7M
1990-12-14 RFI.pdf 2013-12-31 08:15 38M
1991-01-14 monthly report.pdf 2013-12-31 08:32 211K
1991-02-14 monthly report.pdf 2013-12-31 08:45 1.0M
1991-04-03 aprciatn lttr of oprtnty to meet E.G..pdf 2013-12-31 09:12 26K
1991-04-08 draft final RFI report - letter only.pdf 2014-01-03 08:48 31K
1991-05-10 requst for athrztn of file review.pdf 2013-12-31 10:38 35K
1991-05-21 request to view documents.pdf 2014-01-02 08:43 29K
1991-06-24 apprvl for request to revew records.pdf 2014-01-02 08:46 37K
1991-07-08 monthly report.pdf 2014-01-02 08:50 223K
1991-07-26 Public Notice.pdf 2014-01-02 11:12 46K
1991-07-26 Re Reserving Room for Meeting.pdf 2014-01-02 09:03 34K
1991-07-31 news paper artice regarding clean up.pdf 2014-01-02 11:18 129K
1991-07-31 Public Notice.pdf 2014-01-02 11:15 48K
1991-08-03 news paper article regarding clean up.pdf 2014-01-02 11:23 84K
1991-08-06 public info meeting agenda.pdf 2017-03-29 07:46 79K
1991-08-08 grndwtr contamination.pdf 2014-01-02 11:34 113K
1991-08-13 Feasibility Study - letter only.pdf 2014-01-02 11:43 34K
1991-09-13 Phase 2 Envir Site Assessment.pdf 2014-01-09 08:42 1.1M
1991-11-13 monthly report.pdf 2014-01-02 11:47 49K
1991-12-12 draft final RFI report.pdf 2014-01-03 08:55 4.5M
1992-02-18 annual gw mntrng rprt due.pdf 2014-01-02 15:35 38K
1992-03-10 monitoring well data.pdf 2017-03-29 08:03 5.0M
1992-05-14 dcmtn for 90 day trmnt in tanks.pdf 2014-01-02 15:39 98K
1992-05-14 Final RFI report vlm 1 & 2.pdf 2017-03-29 08:26 28M
1992-05-20 final RFI rpt changes to attachment 10.pdf 2014-01-03 14:45 102K
1992-06-15 final rfi report sample calculations.pdf 2014-01-03 14:50 388K
1992-06-19 requested information.pdf 2014-01-03 14:53 40K
1992-06-26 Approval RFI report.pdf 2014-01-06 07:39 57K
1992-07-01 New Page for final RFI report.pdf 2014-01-06 07:41 28K
1992-07-01 RFI report Approval.pdf 2014-01-06 07:43 53K
1992-07-16 pond closure cap-2cracks.pdf 2014-01-06 07:47 234K
1992-07-23 lttr of acptbl aprch to repair cracked pond caps.pdf 2014-01-06 07:51 44K
1992-07-29 rpt on efctvns of gw recvry well systm in upper flow zone.pdf 2014-01-06 09:01 12M
1992-08-25 pre-draft post-closure prmt - letter only.pdf 2014-01-06 07:57 56K
1992-08-28 gw sampling event.pdf 2014-01-06 08:02 38K
1992-09-03 Extension Request - gw sampling.pdf 2014-01-06 09:15 46K
1992-09-10 Extension Request Approval - gw sampling.pdf 2014-01-06 10:10 38K
1992-09-25 document review.pdf 2014-01-06 10:13 34K
1992-10-30 split sampling event.pdf 2014-01-21 10:30 108K
1992-11-05 Draft CMS Report.pdf 2014-01-07 10:19 4.6M
1992-12-17 comments on draft CMS report.pdf 2014-01-06 10:16 285K
1992-12-18 CMS, HSWA Permit, PCCP Meeting.pdf 2014-01-08 08:45 102K
1993-01-08 assmnt qrtly rprt & annl summry.pdf 2014-01-08 09:05 4.7M
1993-02-26 annual grndwtr mntrng report for 1992.pdf 2014-01-09 15:00 5.3M
1993-02-26 technical re-eval of off-site contaminant plume.pdf 2014-01-08 09:16 188K
1993-03-04 lttr to inform of action taken to repair cracks of pond closure cap.pdf 2014-01-08 09:35 624K
1993-03-08 request for a change in analytical methods.pdf 2014-01-08 09:57 49K
1993-03-31 response letter of method change.pdf 2014-01-08 10:34 47K
1993-04-06 Sampling Notification Requirements.pdf 2014-01-08 10:40 41K
1993-04-16 monthly report.pdf 2014-01-10 07:59 157K
1993-04-16 Re Repairs to Cap over the Ponds & Sump.pdf 2014-01-08 11:02 41K
1993-04-21 incomplete document file.pdf 2014-01-08 13:42 45K
1993-05-03 assessment quarterly report.pdf 2014-01-10 08:34 854K
1993-05-06 monthly report.pdf 2014-01-10 08:36 148K
1993-06-22 Rescheduling Sampling Event.pdf 2014-01-08 14:06 78K
1993-07-08 assmnt qrtlt rprt & annl smry.pdf 2014-01-10 09:48 1.1M
1993-07-08 lttr concerning CME.pdf 2014-01-08 14:45 47K
1993-07-15 Comprehensive GW Monitoring Eval.pdf 2017-03-29 11:23 60K
1993-07-27 monthly report.pdf 2014-01-10 10:49 128K
1993-08-18 discussion concerning the VOC.pdf 2014-01-09 07:49 59K
1993-08-23 split sampling.pdf 2017-03-29 11:29 2.1M
1993-08-24 possible downgradient spreading of the VOC plume.pdf 2014-01-09 07:53 48K
1993-08-25 monthly report.pdf 2014-01-13 07:49 128K
1993-08-26 CME lab reports.pdf 2014-01-13 07:54 778K
1993-09-17 commence sampling for 4th qtr.pdf 2014-01-09 08:47 33K
1993-09-28 monthly report.pdf 2014-01-13 07:56 130K
1993-09-29 monthly report - addendum.pdf 2014-01-13 07:58 247K
1993-09-30 summary of informal meeting.pdf 2014-01-09 08:52 103K
1993-10-20 lab report for adtnl sampling.pdf 2017-03-29 11:34 453K
1993-10-22 monthly report.pdf 2014-01-13 08:01 123K
1993-10-26 assesment quarterly report.pdf 2014-01-13 08:12 1.9M
1993-11-11 monthly report.pdf 2014-01-13 08:15 132K
1993-11-18 special gw sampling notification.pdf 2014-01-09 09:16 39K
1993-12-16 monthly report.pdf 2014-01-13 08:19 133K
1994-01-05 assesment quartly report.pdf 2014-01-09 11:01 1.7M
1994-01-12 special sampling analytical reports.pdf 2014-01-09 11:51 4.7M
1994-01-13 GW Sampling Notification.pdf 2014-01-09 11:58 41K
1994-01-14 alternative gw mntrng prgrm data summary for 1993.pdf 2014-01-09 14:01 16M
1994-01-24 -- 42 wells sampling 11-30-12-2-95.pdf 2014-01-21 10:26 131K
1994-02-10 brief regulatory chronology.pdf 2014-01-21 10:13 63K
1994-02-21 meeting agenda.pdf 2014-01-21 10:09 26K
1994-02-28 point of compliance monitoring wells.pdf 2014-01-09 14:06 258K
1994-04-11 Failure to notify upcoming sampling event.pdf 2014-01-09 15:13 43K
1994-04-14 annual assmnt qrtly rprt & smmry.pdf 2014-01-10 07:52 1.4M
1994-04-14 Hazardous Waste Permit - Letter only.pdf 2014-01-09 15:26 32K
1994-04-20 updated post-closure permit app.pdf 2014-01-10 08:26 82K
1994-04-22 request to review files.pdf 2014-01-21 10:06 38K
1994-05-03 natural resource damages.pdf 2014-01-21 09:53 85K
1994-05-16 monthly report.pdf 2014-01-10 08:38 140K
1994-06-06 Scheduled Meeting Re updated Post Closure Permit appl.pdf 2014-01-10 08:40 23K
1994-06-15 monthly report.pdf 2014-01-10 08:42 69K
1994-06-23 monthly report for May 1994.pdf 2014-01-10 09:08 166K
1994-07-01 assesment qurtly rprt & annl smry.pdf 2014-01-10 09:39 1.5M
1994-07-11 commence grndwtr smlpg.pdf 2014-01-10 09:54 29K
1994-07-11 Post Closure Permit Guidance - letter only.pdf 2014-01-10 10:46 46K
1994-08-04 grndwtr remediation-wastewater discharge.pdf 2014-01-13 08:22 95K
1994-08-09 monthly report.pdf 2014-01-13 08:27 141K
1994-09-12 monthly report.pdf 2014-01-13 08:30 141K
1994-09-21 plan to file draft post closure permit app..pdf 2014-01-13 08:33 28K
1994-09-22 comence grndwtr sampling.pdf 2014-01-13 08:36 27K
1994-09-25 RCRA corrctv actn site open house.pdf 2014-01-13 08:38 32K
1994-09-28 request to postpone grndwtr sampling.pdf 2014-01-13 08:42 42K
1994-09-29 appvl of request to potpose grndwtr sampling.pdf 2014-01-13 08:44 40K
1994-10-13 assesment quarterly report.pdf 2014-01-13 09:08 3.0M
1994-10-17 comence grndwtr sampling.pdf 2014-01-13 09:10 40K
1994-11-01 monthly report.pdf 2014-01-13 09:12 147K
1994-11-03 Comments on draft CMS report.pdf 2014-01-13 09:17 55K
1994-11-07 sparton meeting.pdf 2014-01-21 09:50 25K
1994-11-14 copies of grndwtr montrng prgrm.pdf 2014-01-13 09:30 1.1M
1994-11-29 monthly report.pdf 2014-01-13 09:15 145K
1994-11-30 missed holding times for hexavalent chromium.pdf 2014-02-28 09:21 215K
1994-11-30 unable to submit post closure care prmt.pdf 2014-01-13 09:36 35K
1994-12-12 intent to file new post-closure care prmt.pdf 2014-01-21 09:45 37K
1994-12-15 request for extension PCCP.pdf 2014-01-13 09:47 49K
1994-12-16 EPA Review of Draft Rpt on Effectiveness of GW Recovery.pdf 2014-01-13 09:56 167K
1994-12-22 regultd waste activity forms.pdf 2014-01-13 09:59 478K
1994-12-27 results of grndwtr split sampling event.pdf 2017-03-29 15:36 1.2M
1995-01-02 4th quarter 1994 AGMP report.pdf 2014-01-14 08:27 2.0M
1995-01-03 subsquent notification forms - letter only.pdf 2014-01-14 09:44 42K
1995-01-04 monthly report - december.pdf 2014-01-14 09:50 147K
1995-01-04 monthly report -november.pdf 2014-01-14 09:53 146K
1995-01-06 reqrmnts for chrctztn of cntmntn.pdf 2014-01-14 10:48 136K
1995-01-11 apprvl of extension request.pdf 2014-01-14 10:52 39K
1995-01-13 report on efctvns of grndwtr recvr well.pdf 2014-01-14 15:00 55K
1995-01-23 commence grndwtr sampling.pdf 2014-01-14 15:02 35K
1995-01-24 commnts frm FPA on crrcvt mesrs study.pdf 2014-01-14 15:04 56K
1995-01-30 post closure care pernit app.pdf 2014-01-14 15:28 50K
1995-02-15 preliminary PCCP application.pdf 2014-01-15 09:12 7.1M
1995-02-16 Memo extenson request.pdf 2014-01-21 09:26 25K
1995-02-16 Re Extension Request Approval.pdf 2014-01-21 09:22 34K
1995-02-21 -- 1994 annual grndwtr report.pdf 2014-01-15 08:00 8.3M
1995-02-24 cnfrmtn of phone convstn.pdf 2014-01-21 08:14 38K
1995-02-28 extension Request Approval.pdf 2014-01-21 08:11 41K
1995-02-28 revisions to report on efctvns of grndwtr recvry well.pdf 2014-01-15 10:21 14M
1995-03-01 monthly report for January 1995.pdf 2014-01-15 10:27 149K
1995-03-10 characterization of contamination.pdf 2014-01-15 10:34 221K
1995-03-28 data table.pdf 2014-01-21 08:10 106K
1995-03-31 characterization of contamination.pdf 2014-01-15 10:39 199K
1995-03-31 monthly report for February 1995.pdf 2014-01-15 10:41 147K
1995-03-31 post closure permit app.pdf 2014-01-15 10:36 135K
1995-04-04 assmnt of injuries to natrl rsrces.pdf 2014-01-15 13:49 77K
1995-04-04 commence grndwtr sampling.pdf 2014-01-15 11:03 36K
1995-04-05 first quarter 1995 AGMP report.pdf 2014-01-15 14:34 1.4M
1995-04-13 Appreciation Letter.pdf 2014-01-17 11:37 58K
1995-04-28 monthly Report for March 1995.pdf 2014-01-15 13:58 164K
1995-05-05 Additional Monitoring Wells.pdf 2014-01-15 14:50 472K
1995-05-09 post closure permit app.pdf 2014-01-15 14:54 249K
1995-05-12 memorandum WWMD director phone call.pdf 2014-01-15 15:09 44K
1995-05-17 agreement in principle.pdf 2014-01-15 15:13 207K
1995-05-31 Attendance List for Meeting with EPA Re Sparton.pdf 2014-01-21 10:35 28K
1995-06-05 monthly report.pdf 2014-01-16 09:14 154K
1995-06-07 post closure permit app. admin compltns.pdf 2014-01-16 09:18 107K
1995-06-12 Cost Estimates.pdf 2014-01-17 11:43 144K
1995-06-14 GW Investigation Required by EPA.pdf 2014-01-16 13:32 1.2M
1995-06-14 lttr in response to lttr dated 5-5-95.pdf 2014-01-16 11:12 83K
1995-06-15 memo final draft sob for cm.pdf 2014-01-16 13:47 34K
1995-07-05 second quarter 1995 AGMP report.pdf 2017-03-30 09:10 2.1M
1995-07-18 natural resource assessment.pdf 2014-01-16 14:13 78K
1995-07-20 -- 3rd Q 1995 Sampling Notification.pdf 2014-01-17 08:26 37K
1995-07-20 including Albq.on review of draft RCRA sob.pdf 2014-01-17 08:20 93K
1995-07-21 monthly report.pdf 2014-01-17 08:29 154K
1995-08-07 EPA Completion of SOB & Public Notice.pdf 2017-04-06 12:13 644K
1995-08-22 declaration.pdf 2014-01-21 11:04 63K
1995-08-22 EPA docket.pdf 2014-01-21 11:11 295K
1995-08-22 refrence to request.pdf 2014-01-21 11:06 47K
1995-08-24 monthly report.pdf 2014-01-21 11:38 153K
1995-09-06 memorandum discuss site remedial altrntvs.pdf 2014-01-21 12:00 37K
1995-09-07 lttr in rspns to request of canceling publc meetng.pdf 2014-01-23 09:13 334K
1995-09-12 Clean up of GW Contamination.pdf 2014-01-23 09:20 61K
1995-09-22 ltr to sparton.pdf 2014-01-23 09:58 87K
1995-09-28 monthly report.pdf 2014-01-23 10:02 157K
1995-10-02 commence grndwtr sampling.pdf 2014-01-23 10:10 31K
1995-10-03 comments on the draft CMS report.pdf 2014-01-23 11:00 508K
1995-10-10 information request.pdf 2014-01-23 11:10 264K
1995-10-12 requested information- Infante.pdf 2014-01-23 11:18 442K
1995-10-12 requested information-Ward.pdf 2014-01-23 11:15 231K
1995-10-17 Suspension of Public Comment Period.pdf 2014-01-23 11:20 76K
1995-10-23 site chronology.pdf 2014-01-29 15:02 186K
1995-10-24 third qtr 1995 AGMP report.pdf 2017-03-30 09:12 4.0M
1995-11-02 fact sheet.pdf 2014-01-23 12:01 114K
1995-11-06 reaction to EPA's responses.pdf 2014-02-06 15:06 1.7M
1995-11-07 monthly report.pdf 2014-01-23 12:13 186K
1995-11-13 grndwtr contamination.pdf 2014-01-23 12:19 67K
1995-11-14 brief regulatory chronology.pdf 2014-01-23 12:24 141K
1995-11-14 monthly report.pdf 2014-01-23 12:21 155K
1995-11-14 sparton meeting notes & sign up sheet.pdf 2017-03-30 11:22 74K
1995-11-28 Additional Information Request.pdf 2014-01-23 13:30 100K
1995-11-30 article - chemicals haunt water.pdf 2014-01-29 14:56 102K
1995-12-01 hazardous waste emergency fund.pdf 2014-01-23 13:39 52K
1995-12-06 CH2M hill's memo report.pdf 2014-01-29 14:52 1.1M
1995-12-08 Re Remediation Action.pdf 2014-01-23 13:41 118K
1995-12-08 statement of basis.pdf 2017-04-06 12:14 574K
1995-12-18 EPA's revised statement of basis.pdf 2014-01-23 13:58 1.2M
1995-12-20 monthly report.pdf 2014-01-23 14:04 156K
1995-12-27 decision to develop alternate plan for site plume.pdf 2014-01-29 14:32 65K
1996-01-02 fourth quarter 1995 AGMP report.pdf 2014-01-23 16:35 614K
1996-01-03 NMED split sampling event.pdf 2014-01-23 16:41 47K
1996-01-03 notice of non renewal of lttr of credit.pdf 2014-01-30 11:57 36K
1996-01-08 monthly report.pdf 2014-01-23 16:43 120K
1996-01-11 Phase 1 Assessment.pdf 2014-01-23 16:51 80K
1996-01-18 Information Response - statement of basis.pdf 2014-01-24 10:23 1.1M
1996-01-25 SGMP data.pdf 2014-01-24 10:27 231K
1996-01-29 statement of basis.pdf 2017-04-06 12:14 581K
1996-01-30 newspaper article- clean up.pdf 2014-01-29 14:01 80K
1996-01-31 newspaper add -public hearing.pdf 2014-01-29 13:58 105K
1996-02-01 proceedings for hearing pursuant to notice.pdf 2014-01-30 11:16 1.8M
1996-02-02 lttr of cmtmnt to a monthly stat report.pdf 2014-01-29 13:56 33K
1996-02-07 copy of letter being sent to EPA.pdf 2014-01-30 10:53 78K
1996-02-07 NMED comments on the EPA statement of basis.pdf 2014-01-29 12:00 312K
1996-02-08 concerns about epa.pdf 2017-03-30 12:38 242K
1996-02-08 gw contmntn & clean up altrntvs.pdf 2017-04-04 10:39 1.4M
1996-02-08 note to EPA.pdf 2014-02-06 15:07 174K
1996-02-08 RCRA corrective action.pdf 2014-01-29 11:33 246K
1996-02-08 RCRA statement of basis.pdf 2014-01-29 11:28 657K
1996-02-10 newspaper article- bill targets threat to west side water.pdf 2014-01-30 12:02 178K
1996-02-20 EPA's response to comments of 11-6-95.pdf 2014-01-30 09:51 1.6M
1996-02-22 monthly report for January 1996.pdf 2014-02-06 15:09 165K
1996-02-26 -- 1995 annual gw report.pdf 2014-02-07 09:11 16M
1996-02-27 request for information.pdf 2014-01-30 09:41 262K
1996-02-28 -- 1995 BRS extencin apprvl.pdf 2014-02-07 10:06 35K
1996-02-28 request for extension.pdf 2014-02-07 10:08 42K
1996-03-01 Re Admin Record.pdf 2014-01-30 09:37 85K
1996-03-01 split sampling event.pdf 2014-01-30 09:32 48K
1996-03-01 technical review comments on draft CSM report.pdf 2014-01-30 09:30 519K
1996-03-04 Requesting Sampling results.pdf 2014-02-07 11:36 40K
1996-03-08 analytical data.pdf 2014-02-07 11:39 54K
1996-03-11 response to EPA's request for info.pdf 2014-01-30 09:25 277K
1996-03-12 attn to former cleanup at the DEC site.pdf 2014-01-27 11:20 40K
1996-03-12 check for coping charges.pdf 2014-02-07 11:41 28K
1996-03-19 -- 1995 biennial hazardous waste report.pdf 2014-02-10 07:49 942K
1996-03-20 response to EPA's comments on CMS report.pdf 2014-01-30 09:22 191K
1996-03-25 request for info. fax.pdf 2014-01-30 08:23 194K
1996-03-25 static water level elevation data.pdf 2014-01-30 08:27 232K
1996-03-26 Denial 60 day extension request for submission of final CMS.pdf 2014-01-27 11:39 103K
1996-03-26 request for 60 day extension.pdf 2014-01-30 08:05 69K
1996-03-27 monthly report for February 1996.pdf 2014-02-10 07:57 132K
1996-03-29 Approval extension requested for CMS.pdf 2014-01-27 11:34 181K
1996-03-29 split sampling event.pdf 2014-01-27 11:36 34K
1996-04-03 Re 30 day extension instead of 60.pdf 2014-01-27 11:18 110K
1996-04-05 extension for CMS.pdf 2014-01-27 11:29 58K
1996-04-12 split soil-vapor samples.pdf 2014-01-27 09:52 95K
1996-04-16 commence grndwtr sampling.pdf 2014-01-27 09:37 43K
1996-04-16 first qurtr 1996 AGMP report.pdf 2014-02-10 08:07 674K
1996-04-17 formally invoked the dispute resltn prvsns.pdf 2014-01-27 09:35 124K
1996-04-18 notes sparton meeting.pdf 2014-03-04 14:18 75K
1996-04-18 second qtr 1996 grndwtr sampling.pdf 2014-01-27 09:46 39K
1996-04-23 air samples 04-11-1996.pdf 2014-02-18 12:06 367K
1996-04-23 air samples 4-12-1996.pdf 2014-02-18 14:14 372K
1996-04-23 air samples 04-10-1996.pdf 2014-02-18 14:09 456K
1996-04-23 aqueous samples 04-15-1996.pdf 2014-02-18 14:52 367K
1996-04-24 NMED comments on EPA's prpsd admin order on consent.pdf 2014-01-27 09:25 237K
1996-04-25 monthly report for March 1996.pdf 2014-02-10 08:11 132K
1996-04-29 confirmation of meeting.pdf 2014-01-27 09:21 33K
1996-05-01 deep soil gas results.pdf 2014-01-27 08:56 105K
1996-05-01 suggested conference.pdf 2014-01-27 08:47 130K
1996-05-01 understanding the cost & feasibility of any pump & use systm.pdf 2014-01-27 09:11 75K
1996-05-03 lttr in rspns to extension request.pdf 2014-01-27 08:37 103K
1996-05-03 Re Conversion Calculations.pdf 2014-01-27 08:53 146K
1996-05-04 newspaper article-mayor pushes for cleanup.pdf 2014-01-27 08:35 136K
1996-05-04 newspaper article-pollution threatens water.pdf 2014-01-27 08:30 92K
1996-05-06 resolution.pdf 2017-03-30 15:35 146K
1996-05-08 thank you lttr to gvnr johnson.pdf 2014-01-27 08:24 47K
1996-05-10 source area investigation.pdf 2014-01-27 07:59 253K
1996-05-13 draft final corrective msrs study rprt.pdf 2014-02-11 11:42 20M
1996-05-14 adtnl soil vapor investigations.pdf 2014-01-27 07:56 177K
1996-05-16 modification to closure plan.pdf 2014-01-27 07:53 67K
1996-05-21 statement of basis.pdf 2014-02-10 08:19 227K
1996-05-22 cndtnl aprvl on prpsl to install adtnl mntrng wells.pdf 2014-01-27 07:51 180K
1996-05-24 monthly report.pdf 2014-02-10 08:25 166K
1996-05-29 addtnl monitoring well instltn.pdf 2014-01-27 07:49 355K
1996-05-30 battelle report.pdf 2017-03-30 16:29 1.4M
1996-06-04 statement of basis.pdf 2014-02-10 09:13 49K
1996-06-06 follow up lttr to stlmnt meeting.pdf 2014-01-27 07:42 275K
1996-06-06 notice of imminet & substnsl endgrmnt.pdf 2014-02-10 09:25 160K
1996-06-06 prpsl to instl sngl nest of vaor probe.pdf 2014-01-27 07:46 98K
1996-06-06 treatment of produced grndwtr.pdf 2014-02-10 09:34 674K
1996-06-10 ONRT's comments on Draft CMS Rpt.pdf 2014-02-10 10:24 494K
1996-06-10 vapor probe nest instalation.pdf 2014-01-24 15:02 155K
1996-06-13 soil sample results.pdf 2014-02-28 10:56 1.1M
1996-06-17 instalation of additional grndwtr monitoring wells.pdf 2014-01-24 14:58 51K
1996-06-24 final decision & rspns to cmmnts RCRA crrctv actn.pdf 2017-03-31 10:12 2.3M
1996-06-24 press release.pdf 2017-03-31 11:02 98K
1996-06-28 news article-clean up costs.pdf 2014-01-24 14:49 79K
1996-07-02 draft RCRA admin order.pdf 2014-02-10 09:01 2.5M
1996-07-02 gw contamination.pdf 2014-02-11 14:11 120K
1996-07-10 updated corrective action recommendations.pdf 2014-01-24 14:36 193K
1996-07-17 soil vapor & grndwtr extraction.pdf 2014-01-24 14:33 86K
1996-07-22 corrective action proposals.pdf 2014-01-24 12:39 224K
1996-07-22 vapor probe split sampling results.pdf 2017-03-30 17:03 3.5M
1996-07-23 second qutr 1996 AGMP report.pdf 2014-02-11 14:27 2.7M
1996-07-30 receipt of 4 files.pdf 2014-01-24 12:40 21K
1996-07-30 receipt of modified soil-vapor extraction proposal.pdf 2014-01-27 13:10 45K
1996-08-05 waste clfctn of vapor probe drill cutng.pdf 2014-02-11 14:44 151K
1996-08-06 lttr to confirm phone conversation.pdf 2014-01-24 12:35 70K
1996-08-07 complaint for declaratory judgment.pdf 2014-01-27 13:23 354K
1996-08-07 lttr in response to lettr.pdf 2014-01-24 12:12 84K
1996-08-07 soil vapor extraction.pdf 2014-01-24 12:16 33K
1996-08-12 vapor extraction system pilot testing.pdf 2014-01-27 12:47 206K
1996-08-15 meeting to disscus soil vapor extraction issues.pdf 2014-01-27 12:50 69K
1996-08-16 lttr to confirm phone convstn.pdf 2014-01-27 13:05 88K
1996-08-19 regarding meeting.pdf 2014-02-21 10:26 116K
1996-08-20 3rd qtr 1996 AGMP well results.pdf 2014-01-27 12:39 299K
1996-08-22 clcltns of hydrlc inflnc grndwtr contmnt wells.pdf 2014-01-27 13:37 1.2M
1996-08-23 Concerned with Characterization.pdf 2014-01-28 08:03 125K
1996-08-28 draft intsltn digrms & sample logs.pdf 2014-01-28 08:40 672K
1996-08-29 lttr to adress deficiencies.pdf 2014-01-29 09:47 80K
1996-08-29 response to lttr of cncrng waste clsfctn of vapor probe drill cutting.pdf 2014-02-11 15:10 45K
1996-08-29 response to lttr.pdf 2014-01-29 09:39 76K
1996-09-12 lttr to confirm phone conversation.pdf 2014-01-29 09:41 76K
1996-09-16 initial admin order.pdf 2014-02-27 12:35 2.8M
1996-09-18 corrective action proposals.pdf 2014-02-12 08:55 2.2M
1996-09-20 -- 4th Q 1996 GW Sampling Event.pdf 2014-02-12 08:06 37K
1996-10-01 third qtr 1996 AGMP report.pdf 2014-02-12 08:43 2.8M
1996-10-12 water sample results.pdf 2014-02-28 10:51 294K
1996-10-17 revised interm corrective action proposals.pdf 2014-01-29 09:52 260K
1996-10-29 response to lttr.pdf 2014-01-29 10:24 154K
1996-11-18 requierments for NMED approval.pdf 2014-01-29 10:26 87K
1996-11-21 clarification of response to NMED 10-17-96 lttr.pdf 2014-01-29 10:28 233K
1996-11-26 disposal of water through public storm draind.pdf 2014-01-29 10:31 112K
1996-12-02 response to lttr 11-21-96.pdf 2014-01-29 10:35 106K
1996-12-07 propsls for aquifer test-extrctn demo-addt to mntrng ntwrk.pdf 2017-03-30 17:09 852K
1996-12-10 fourth qtr 1996 AGMP report.pdf 2014-02-12 09:44 2.1M
1996-12-17 response to lttr 12-9-96.pdf 2014-01-29 10:59 159K
1996-12-19 discharge permit.pdf 2014-01-29 11:23 80K
1997-01-03 response to proposals.pdf 2014-02-12 11:22 281K
1997-01-10 response letter.pdf 2014-02-20 12:15 165K
1997-01-17 response to NMED comments.pdf 2014-02-12 11:28 819K
1997-01-21-- 1st qtr 1997 grndswtr sampling event.pdf 2014-02-12 11:34 41K
1997-01-27 soil vapor recovery well instal schedule.pdf 2014-02-20 12:19 37K
1997-01-30 -- 1996 annual grndwtr report.pdf 2017-04-04 10:35 13M
1997-01-31 soil vapor recovery well instal schedule.pdf 2014-02-20 12:22 50K
1997-02-03 impact on grndwtr-resource avalability.pdf 2014-02-12 14:45 1.0M
1997-02-03 performance of injection wells.pdf 2014-02-20 10:55 311K
1997-02-04 application for NPDES permit.pdf 2014-02-20 14:15 670K
1997-02-04 report of Pierce L Chandler Jr.pdf 2014-02-21 11:38 1.9M
1997-02-06 response to 1-17-97 lttr.pdf 2014-02-12 15:19 193K
1997-02-19 civil action for injunctive relif.pdf 2014-02-13 07:55 611K
1997-02-19 civil action.pdf 2014-02-13 07:58 332K
1997-02-19 complaint.pdf 2014-02-27 09:51 951K
1997-02-19 news paper article sparton slapped with 2 lawsuites.pdf 2014-02-20 15:06 239K
1997-02-19 response to motion for prelim injctn.pdf 2014-02-27 08:37 935K
1997-02-19 statement of sparton.pdf 2014-02-20 14:20 127K
1997-02-20 newspaper article west side polluter hit with lawsuits.pdf 2014-02-21 08:25 130K
1997-02-21 Newspaper - Headlines Regarding Public Suit.pdf 2014-02-13 08:03 253K
1997-02-24 air samples 2-20-1997.pdf 2014-02-18 11:29 1.6M
1997-02-24_Affidavit.pdf 2014-03-05 10:14 493K
1997-02-25 SVE pilot test fax.pdf 2014-02-21 08:33 231K
1997-02-25 SVE pilot test.pdf 2014-02-21 08:31 64K
1997-03-05 air samples 2-28-1997.pdf 2014-02-18 11:16 1.4M
1997-03-10 final results of SVE pilot test.pdf 2014-02-18 11:52 121K
1997-03-14 revised final crrctv msrs study report.pdf 2014-02-13 08:16 1.0M
1997-03-17 motion to consolidate.pdf 2014-02-13 08:21 316K
1997-03-25 answer of defendant.pdf 2014-02-27 09:44 385K
1997-03-25 posting of notice-imminet & sbstntl endgmnt.pdf 2014-02-13 08:29 73K
1997-03-26 air samples 03-20-1997.pdf 2014-02-18 11:36 1.7M
1997-03-31 affidavit.pdf 2014-02-21 08:51 106K
1997-03-31 Public Comment Letter - Brooks.pdf 2014-02-21 08:44 43K
1997-04-01 defendants brief in support of motion.pdf 2014-02-13 08:41 683K
1997-04-01 defendants motion to stay dismiss or transfer venue.pdf 2014-02-13 08:44 89K
1997-04-01 plaintiff's joint opposed motion.pdf 2014-02-27 09:40 1.4M
1997-04-03 albuquerque litigation.pdf 2014-02-13 08:51 74K
1997-04-04 albuquerque litigation.pdf 2014-02-13 08:53 68K
1997-04-04 posting on notices.pdf 2014-02-21 09:01 83K
1997-04-04 Response to Letter.pdf 2014-02-13 08:55 68K
1997-04-08 -- 3 Suits.pdf 2014-02-13 08:58 261K
1997-04-08 GW sampling event.pdf 2014-02-13 08:59 41K
1997-04-11 latest copies of the pleadings& crrespondence.pdf 2014-02-27 13:51 2.6M
1997-04-14 first qtr 1997 AGMP report.pdf 2014-02-24 07:52 1.4M
1997-04-22 posting of notices.pdf 2014-02-13 09:01 96K
1997-04-22 vapor recovery well testing results - letter only.pdf 2014-02-21 09:21 38K
1997-04-30 Discussed Data.pdf 2014-02-18 11:39 104K
1997-05-01 discharge plan.pdf 2014-02-21 09:24 76K
1997-05-01 EPA lifts federal work ban.pdf 2014-02-21 09:39 64K
1997-05-15 Response to Motion & Exhibits.pdf 2014-02-13 10:49 19M
1997-05-22 public records insctn request.pdf 2014-02-13 11:07 53K
1997-06-10 grndwtr mntrng data 2nd qtr 1997.pdf 2017-03-31 09:35 311K
1997-06-18 report-soil gas chrctztn & vapor extrct systm pilot testing.pdf 2014-02-24 09:01 4.1M
1997-06-27 public records request.pdf 2014-02-21 09:30 44K
1997-07-17 second qtr 1997 AGMP report.pdf 2014-02-24 08:00 1.7M
1997-07-18 grndwtr sampling.pdf 2014-02-21 09:40 41K
1997-07-28 3rd qtr 1997 grndwtr sampling event.pdf 2014-02-21 09:34 50K
1997-07-30 response to report-soil gas chrctztn.pdf 2014-02-21 09:43 36K
1997-08-07 order.pdf 2014-02-13 11:38 59K
1997-08-21 analytical results.pdf 2014-02-24 09:13 1.2M
1997-09-03 comments on soil gas chrctztn & vapor extrctn sytm.pdf 2014-02-13 11:45 277K
1997-09-03 project schedule for proposal.pdf 2014-02-21 10:29 35K
1997-09-05 background.pdf 2014-02-27 11:20 214K
1997-09-22 order.pdf 2014-02-13 14:14 38K
1997-09-23 hazardous waste plume.pdf 2014-02-24 09:15 61K
1997-09-24 percolation test results.pdf 2014-02-21 11:06 164K
1997-09-24 USBR open-end permeability test.pdf 2014-02-24 10:20 1.0M
1997-09-26 comparing cost estimates for SVE.pdf 2014-02-13 14:48 294K
1997-10-03 prelmnry prmbilty & prcltn test results.pdf 2014-02-24 09:38 44K
1997-10-09 backup info on SVE calculations.pdf 2014-02-24 10:02 123K
1997-10-09 grndwtr mntrng data 3rd qtr 1997.pdf 2017-04-04 13:38 6.7M
1997-10-09 thrd qtr 1997 AGMP report.pdf 2014-02-24 08:12 720K
1997-10-20 inqury about grndwtr contmntn.pdf 2014-02-24 09:28 352K
1997-10-21 History of State.pdf 2014-02-24 08:36 142K
1997-10-24 Response to Recent Settlement Conference.pdf 2014-02-25 08:32 128K
1997-10-24 response to settlement offer.pdf 2014-02-20 10:50 354K
1997-10-9 -- 4th qtr 1997 grndwtr sampling event.pdf 2014-02-24 09:42 38K
1997-11-25 article, owners want builder to buyt back their houses.pdf 2014-02-25 08:57 358K
1997-12-04 Annual & Semi-Annual reports.pdf 2014-02-25 09:05 222K
1997-12-04 lttr regarding perfrmance of grndwtr treatment system.pdf 2014-02-28 08:19 78K
1997-12-12 fourth qtr 1997 AGMP report.pdf 2014-02-24 08:25 1.9M
1997-12-31 -- 1996 annual grndwtr report.pdf 2014-02-25 11:50 26M
1998-01-07 First Quarter 1998 GW sampling event.pdf 2014-02-14 10:47 36K
1998-01-08 newspaper article-agencis stop west side water-contmntn talks.pdf 2014-02-20 09:44 109K
1998-01-09 initial scheduling order.pdf 2014-02-27 13:37 72K
1998-01-16 settlement discussions.pdf 2014-02-17 07:35 153K
1998-01-23 grndwtr remediation.pdf 2014-02-17 07:40 497K
1998-02-10 final admin order.pdf 2014-02-27 11:17 4.8M
1998-02-13 penalty computation worksheet.pdf 2014-03-04 14:55 68K
1998-02-17 city of abq vs sparton.pdf 2014-02-17 08:08 477K
1998-02-19 split sampling.pdf 2014-02-19 09:12 627K
1998-02-24 notice of hearing.pdf 2014-02-17 08:10 47K
1998-02-25 final admin order.pdf 2014-02-17 08:21 37K
1998-02-25 framework to better understand the procedural posture.pdf 2014-02-20 07:56 130K
1998-02-26 public notice.pdf 2014-02-17 08:38 189K
1998-03-04 GW monitoring plan.pdf 2014-02-17 08:51 591K
1998-03-06 fourth qtr 1997 AGMP report.pdf 2014-02-17 09:09 2.1M
1998-03-11 EPA split sample data.pdf 2014-02-20 08:08 162K
1998-03-26 NOV-ags office.pdf 2014-02-20 09:42 81K
1998-03-26 NOV.pdf 2014-02-20 08:26 134K
1998-03-27 final admin order issued.pdf 2014-02-20 09:51 91K
1998-04-03 draft letter.pdf 2014-02-20 10:21 43K
1998-04-07 permit app-as discussed.pdf 2014-02-20 10:26 233K
1998-04-08 emergency authorization.pdf 2014-02-20 10:39 49K
1998-04-09 final admin order.pdf 2014-02-25 14:31 86K
1998-04-13 final admin order.pdf 2014-02-25 15:01 182K
1998-04-13 notice of initial cmplnc test.pdf 2014-02-25 14:58 58K
1998-04-13 second qtr 1998 gw sampling event.pdf 2014-02-17 09:21 634K
1998-04-14 authrztn for workplan well.pdf 2014-02-25 15:04 42K
1998-04-16 pre final draft.pdf 2014-03-05 08:42 1.0M
1998-04-17 Acreage for Assurance Letter.pdf 2017-04-04 16:18 138K
1998-04-17 air quality permit.pdf 2017-04-04 16:17 233K
1998-04-23 proposal to instal recovery well.pdf 2014-02-26 07:57 411K
1998-04-24 city of abq v sparton.pdf 2014-02-26 08:07 87K
1998-04-29 notice of 30-day SVE emission test.pdf 2014-02-26 08:11 38K
1998-04-30 final admin order.pdf 2014-02-26 08:09 106K
1998-05-01 soil gas info summary.pdf 2014-02-26 08:22 187K
1998-05-05 transmittal of gw mntrng plan.pdf 2014-02-18 08:24 3.9M
1998-05-18 aqueous samples 4-23-98.pdf 2014-02-18 08:44 1.4M
1998-05-19 second qtr 1998 AGMP report.pdf 2014-02-18 09:07 589K
1998-06-06 notice of monthly SVE emission test.pdf 2014-02-26 08:15 46K
1998-06-09 health & safty WP and SVE WP.pdf 2017-04-05 08:24 1.9M
1998-06-10 Public Involvement Plan for CMI.pdf 2014-02-26 08:20 68K
1998-06-12 air samples.pdf 2014-02-26 08:24 288K
1998-06-16 newspaper article counsil oks sparton cleanup.pdf 2014-02-26 08:45 237K
1998-06-16 sparton v lumbermens.pdf 2014-02-26 08:35 104K
1998-06-18 sparton database.pdf 2014-02-27 08:17 575K
1998-06-22 wrk plan for eval of cntanmnt systm prfmnc.pdf 2014-02-26 09:33 166K
1998-06-24 SVE sampling.pdf 2014-02-26 09:14 61K
1998-06-25 propossed list of action items.pdf 2014-03-04 14:52 79K
1998-06-26 grndwtr contmntn.pdf 2014-02-26 09:15 72K
1998-06-29 -- 1998 grndwtr sampling event 3rd Qtr.pdf 2014-02-27 08:20 34K
1998-06-30 EPA comments.pdf 2014-02-26 09:17 157K
1998-07-07 agreed order.pdf 2014-02-27 13:31 676K
1998-07-07 sparton to begin cleanup process.pdf 2014-02-26 09:19 57K
1998-07-09 comments.pdf 2014-02-19 08:58 48K
1998-07-15 WP for eval of off-site cntmnt system prfmnc.pdf 2014-02-26 14:03 444K
1998-07-15 WP for eval of off-site cntnmnt system.pdf 2014-02-26 13:52 308K
1998-07-17 lttr to editor-abq journal.pdf 2014-02-26 14:20 63K
1998-07-20 WP for assmnt of off-site aquifer restratn fax.pdf 2014-02-26 14:56 443K
1998-07-20 WP for assmnt of off-site aquifer restratn.pdf 2014-02-26 15:30 365K
1998-07-22 Regarding soil vapor wp.pdf 2014-02-27 07:59 294K
1998-07-23 Fax - alt prpsl-install a rcvry well.pdf 2017-04-05 09:27 597K
1998-07-24 3rd qtr 1998 gw sampling event.pdf 2014-02-27 08:24 32K
1998-07-24 alt prpsl-install & rcvry well pumping@ 50 gal per min.pdf 2014-02-27 08:06 966K
1998-07-27 revised public involvment plan.pdf 2017-04-05 09:26 148K
1998-07-28 notice of SVE emission test.pdf 2014-02-19 09:42 38K
1998-08-05 schedule for setlement activities.pdf 2014-02-19 09:48 363K
1998-08-06 draft status report.pdf 2017-04-05 09:35 230K
1998-08-06 start ofSVE design issues.pdf 2014-02-19 10:48 245K
1998-08-07 soil vapor extraction design issues.pdf 2014-02-19 09:56 240K
1998-08-10 joint ststus report.pdf 2014-02-19 10:52 272K
1998-08-12 response to 50 gpm proposal.pdf 2014-02-19 11:32 329K
1998-08-13 co-plantiffs written list.pdf 2014-02-19 11:35 86K
1998-08-19 notification of planed sampling event.pdf 2014-02-19 11:40 48K
1998-09-04 joint status report.pdf 2014-02-19 14:52 163K
1998-09-04 proposed outlines for off-site containment.pdf 2014-02-19 15:14 1.6M
1998-09-04 restoration wp outline.pdf 2014-02-19 11:58 240K
1998-09-24 3rd qtr 1998 AGMP report.pdf 2014-02-28 08:36 5.7M
1998-09-24 well replacement-retrofitting.pdf 2014-02-19 15:39 81K
1998-09-25 grndwtr mntrng & SVE lab reports 3rd qtr 1998.pdf 2017-04-05 10:49 667K
1998-10-01 EPA consent order.pdf 2017-04-05 10:52 3.6M
1998-10-13 Concern over Delay.pdf 2017-04-06 12:15 48K
1998-10-16 plan to shut off acuvac system.pdf 2014-02-28 08:14 29K
1998-10-23 work plan instal of a source contmnt system.pdf 2014-02-28 10:16 1.1M
1998-10-23 wrk plan for assmnt of aquifer restoration.pdf 2014-02-28 10:24 381K
1998-10-23 wrk plan for off-site cntmnt system.pdf 2014-02-28 10:43 3.0M
1998-10-23 zone invstgtn work plan.pdf 2014-02-28 09:26 874K
1998-11-16 water level data.pdf 2014-02-28 10:47 91K
1999-01-06 rqust for asstnc in prfrmnc of first AUA.pdf 2014-03-03 08:12 105K
1999-01-20 agreed order.pdf 2014-03-03 10:46 247K
1999-01-27 aprvl of rvsd infltrtn gallery plans.pdf 2014-03-03 08:15 69K
1999-02-01 gw mntrng prgm semi anl prgrs rprt.pdf 2014-03-03 09:06 1.8M
1999-02-02 ntfctn of 1st qtr 1999 gw sampling.pdf 2014-03-03 08:17 28K
1999-02-08 cnstrtn wrk plan-off-site cntanment.pdf 2014-03-03 08:23 143K
1999-02-18 work plans.pdf 2014-03-03 08:53 4.6M
1999-04-02 rprt on instal of on-site mntrng wells.pdf 2014-03-03 09:18 1.3M
1999-04-14 off-site contmnt well.pdf 2014-03-03 09:24 234K
1999-04-21 update on EPA's activities.pdf 2014-03-03 09:29 238K
1999-05-04 annl HWMB fee asmnt.pdf 2014-03-03 09:36 119K
1999-05-06 Authority to Construct Permit #1203.pdf 2017-04-06 12:25 273K
1999-06-11 lttr-request for hearing and answer.pdf 2014-03-03 10:05 275K
1999-06-17 Vadose Zone IR - Additonal Soil Gas Characterization.pdf 2017-04-06 13:42 4.0M
1999-06-25 national press conferemce.pdf 2014-03-03 10:11 79K
1999-07-14 notice of hearing.pdf 2014-03-03 10:22 58K
1999-07-29 idntfctn of witnss.pdf 2014-03-03 10:27 73K
1999-07-29 motion for continnc of hearing.pdf 2014-03-03 10:34 64K
1999-08-17 order for contnce of hearing.pdf 2014-03-03 10:36 44K
1999-08-30 order for continuance.pdf 2014-03-03 10:39 39K
1999-09-10 invoice number 991575.pdf 2014-03-03 10:42 31K
1999-10-13 lease agreement.pdf 2014-03-07 08:57 1.8M
1999-10-18 post closure care permit app..pdf 2014-03-05 12:09 46K
1999-10-22 financial assurance under cost decree.pdf 2014-03-05 12:11 67K
1999-11-01 grndwtr mntrng program plan.pdf 2017-04-06 12:35 773K
1999-11-05 financial assurance.pdf 2014-03-06 09:11 159K
1999-11-17 cost estimate for financial assurance purposes.pdf 2014-03-06 09:19 1.5M
1999-12-08 monthly report.pdf 2014-03-06 09:25 858K
1999-12-31 cost assurance.pdf 2014-03-06 09:49 174K
2000-01-01 form 10-Q.pdf 2014-03-10 08:03 613K
2000-01-01 wrk plan for the assmnt of aquifer rstrtn.pdf 2014-03-10 09:00 431K
2000-01-20 closure meeting-financial assurance.pdf 2014-03-06 11:23 36K
2000-01-20 semi-anual CRF GWMP progress report.pdf 2017-04-06 13:31 1.1M
2000-01-21 telephone call-1-21-00.pdf 2014-03-06 15:09 111K
2000-01-25 lttr to cnfrm meeting on 1-28.pdf 2014-03-06 15:15 232K
2000-01-25 updated location-closure meeting.pdf 2014-03-06 15:11 70K
2000-01-27 federal register.pdf 2014-03-06 15:17 215K
2000-01-28 Response to Agency Comments from 1-21-2000.pdf 2017-04-06 12:32 1.4M
2000-02-02 Summary of 1-28-00 Meeting Re Closure Financial Assurance Cost Estimate.pdf 2017-04-06 12:31 211K
2000-02-03 proposal to add chromium trtmnt process to off-site cntmnt systm.pdf 2014-03-06 15:21 47K
2000-02-07 semi-annual CRF GWMP progress report.pdf 2014-03-06 15:22 34K
2000-02-08 meeting-closure financial assurance cost estimate.pdf 2014-03-06 15:26 42K
2000-02-08 post-closure care cost estimate.pdf 2014-03-06 15:24 35K
2000-02-22 withdrawal of hearing request.pdf 2014-03-06 15:29 153K
2000-02-29 annual audit for 1999.pdf 2014-03-06 15:31 67K
2000-03-03 GW Remediation.pdf 2017-04-06 12:35 34K
2000-03-12 Re Project Manager.pdf 2014-03-06 15:33 34K
2000-03-13 consent decree.pdf 2014-03-10 11:02 21M
2000-03-30 annual unit audit-1999.pdf 2014-03-06 15:35 45K
2000-04-03 fax-telephone message.pdf 2014-03-06 15:37 35K
2000-04-06 Questionaire.pdf 2014-03-06 15:39 129K
2000-04-07 monthly report ending 3-31-00.pdf 2014-03-06 15:41 98K
2000-04-14 consent decree.pdf 2014-03-06 15:46 211K
2000-04-20 agreement to modify schedules for completion of work.pdf 2014-03-06 15:49 113K
2000-05-01 Notification for Public Involvement Plan.pdf 2014-03-06 15:50 115K
2000-05-02 Notification for Public Involvement Plan.pdf 2014-03-07 08:10 150K
2000-05-04 monthly progress report.pdf 2014-03-06 15:52 108K
2000-05-04 Notification for Public Involvement Plan.pdf 2014-03-07 08:12 61K
2000-05-08 agrmnt to mdfy scdls for cmpltn of work.pdf 2014-03-07 08:15 113K
2000-05-11 Copy of Lease Agreement.pdf 2014-03-07 09:03 37K
2000-05-19 draft-public invlvmnt plan ntfctn.pdf 2014-03-07 09:12 187K
2000-05-23 draft-public invlmnt plan ntfctn.pdf 2014-03-07 09:36 175K
2000-05-24 agreement to modify schedules.pdf 2014-03-07 09:38 60K
2000-05-26 discharge plan modification.pdf 2014-03-07 09:42 317K
2000-05-31 agreement to modify schedules for cmptn of work.pdf 2014-03-07 09:48 139K
2000-05-31 financial assurance comments.pdf 2014-03-07 09:44 77K
2000-06-01 1999 annual report.pdf 2014-03-07 11:16 9.0M
2000-06-07 monthly report- ending 5-31-00.pdf 2014-03-07 11:50 126K
2000-06-30 annual unit audit-1999.pdf 2014-03-07 12:14 199K
2000-07-03 annual unit audit-1999.pdf 2014-03-07 12:16 140K
2000-07-05 Order of Withdrawal of Final Administrative Order.pdf 2017-04-06 12:36 71K
2000-07-13 Permit to Divert Underground Waters.pdf 2017-04-06 12:38 168K
2000-07-25 notification grndwtr sampling.pdf 2014-03-07 12:29 35K
2000-08-02 Request for Hearing and Answer.pdf 2017-04-06 12:39 243K
2000-08-04 -- 1999 annual report-sig. page.pdf 2014-03-07 12:48 54K
2000-08-07 monthly report-july 2000.pdf 2014-03-10 07:47 97K
2000-08-07 Notice of Docketing & Hearing Officer Assignment.pdf 2017-04-06 12:41 35K
2000-08-09 -- 1999 annual report.pdf 2014-03-10 07:50 510K
2000-08-11 Information Lookup.pdf 2014-03-10 07:55 604K
2000-08-11 page frm SEC 10-Q report.pdf 2014-03-10 07:58 118K
2000-08-14 trsmtl lttr signature page.pdf 2014-03-10 08:19 41K
2000-08-16 financial assurance.pdf 2014-03-10 08:05 210K
2000-08-17 city of Abq intrests & athrztns.pdf 2014-03-10 08:28 89K
2000-09-05 rvsd RCRA post-closure prmt appl..pdf 2013-12-18 10:30 6.2M
2000-09-13 Lease Agreement Approval.pdf 2017-04-06 12:43 26K
2000-09-13 Lease Agreement.pdf 2017-04-06 12:42 103K
2000-09-15 due dates for responses to comments.pdf 2014-03-10 08:35 36K
2000-09-19 call-9-20.pdf 2014-03-10 08:37 13K
2000-09-28 response to 8-9-00 comments by USEPA & NMED.pdf 2014-03-10 08:47 1.5M
2000-10-01 Standard Practice for Wildlife Toxicity Reference Values.pdf 2015-08-04 14:35 322K
2000-10-01 Wildlife Toxicity Assessment for TNT.pdf 2015-08-04 14:38 502K
2000-10-10 financial assurance.pdf 2014-03-10 08:55 350K
2000-10-11 NMED corrective action goal.pdf 2014-03-10 08:51 143K
2000-11-20 Revised Pages Post Closure Permit App.pdf 2017-04-06 12:44 35K
2000-11-29 License Agreement.pdf 2017-04-06 12:46 430K
2000-12-19 notice of admin completeness.pdf 2014-03-10 08:52 66K
2000-12-28 notice of admin cmpltns revised RCRA post closure prmt app..pdf 2014-03-10 09:07 143K
2000-12-29 Quitclaim Deed.pdf 2017-04-06 12:47 131K
2001-01-16 EI forms - CA725 & CA750.pdf 2014-03-10 11:16 436K
2001-01-31 Construction WP.pdf 2017-04-06 12:48 240K
2001-02-09 GW Semi Annual Rpt for 3rd & 4th Q 2000.pdf 2017-04-06 12:53 879K
2001-02-13 appvl of the source cntmnt sytm cnstrctn wrk pln.pdf 2014-03-10 11:19 75K
2001-02-20 Construction WP Approval.pdf 2017-04-06 12:54 44K
2001-02-28 draft-annual unit audit -2000.pdf 2014-03-10 11:22 63K
2001-04-02 invoice-post-cloaure permit app.pdf 2014-03-10 11:26 24K
2001-04-05 pond & sump cap fence.pdf 2014-03-11 08:28 139K
2001-04-23 WP for Testing & Replacing Monitoring Well MW-71.pdf 2014-03-11 09:25 228K
2001-04-24 Schedule for Testing and Replacing Monitoring Well MW-71.pdf 2017-04-06 12:55 56K
2001-04-26 lttr confrms rcpt of ck # 202010.pdf 2014-03-11 09:01 31K
2001-04-26 notice of security fence mvmnt aprvl.pdf 2014-03-11 08:31 140K
2001-05-17 -- 2000 Annual Report.pdf 2019-04-18 09:58 27M
2001-05-24 WP for Testing & Replacing Monitoring Well MW-71.pdf 2017-04-06 12:56 356K
2001-06-11 -- 2000 annual report.pdf 2014-03-11 09:30 544K
2001-06-12 wrk plan for testing & rplcng mntrng well.pdf 2014-03-11 09:37 46K
2001-06-21 AUA-2001 & AUA stlmnt for 1999 & 2000.pdf 2014-03-17 11:42 85K
2001-06-21 Public Involvement Plan - 2001 Fact Sheet.pdf 2014-03-11 09:53 241K
2001-06-22 request for suplmntl info.pdf 2014-03-11 10:57 208K
2001-06-29 annual unit audit-2000.pdf 2014-03-11 11:09 113K
2001-06-29 RCRA Corrective Action Environmental Indicator CA725 & CA750.pdf 2014-11-21 12:48 271K
2001-07-05 Revisions to WP for Testing & Replacing Well.pdf 2014-03-11 11:28 56K
2001-07-23 post-closure permit app.pdf 2014-03-11 11:33 68K
2001-08-07 comments on HWB request for spplmntl info.pdf 2014-03-11 11:45 71K
2001-08-09 monthly progress report.pdf 2014-03-11 11:58 87K
2001-08-17 grndwtr mntrng prgram plan 1st&2nd qtr 2001.pdf 2014-03-11 12:15 1.6M
2001-08-17 report of independent accounts.pdf 2014-03-12 10:32 72K
2001-08-21 comments-2000 annual report.pdf 2014-03-11 14:48 63K
2001-08-21 consent decree-dispute resolution.pdf 2014-03-11 14:36 133K
2001-08-22 dispute over post closure care permit.pdf 2014-03-11 14:52 132K
2001-09-21 mutual agreement to extend informal ngtatns.pdf 2014-03-11 15:11 40K
2001-09-26 notice of personnal changes.pdf 2014-03-18 12:29 61K
2001-10-05 Post Closure Care Permit Application.pdf 2017-04-06 12:57 65K
2001-10-30 Position Paper - Use of Low Flow and other Nontraditional Sampling.pdf 2015-08-04 14:40 245K
2001-11-04 monthly progress report-10-31-2001.pdf 2014-03-11 15:15 108K
2001-11-13 resolution of request for suplmntl info.pdf 2014-03-12 07:47 70K
2001-11-21 certfctn of clean closure.pdf 2014-03-12 07:50 239K
2001-11-29 Final Rpt on SVE System.pdf 2014-03-12 07:52 362K
2001-12-05 old drum strg area clean clsr prpsl.pdf 2014-03-12 08:11 104K
2001-12-07 monthly progress report-11-30-2001.pdf 2014-03-12 08:40 96K
2001-12-10 sparton v NMED.pdf 2014-03-12 08:17 52K
2001-12-11 request for financial assurance info.pdf 2014-03-12 08:43 72K
2001-12-14 agreement to modify date for sbmtng updtd fincl asrnc info.pdf 2014-03-12 09:06 179K
2001-12-18 financial assurance estimate.pdf 2014-03-12 10:14 302K
2001-12-19 support use of financial test.pdf 2017-04-05 13:43 3.3M
2001-12-20 settlement agreement.pdf 2014-03-12 11:04 297K
2001-12-27 old drum storage area clean clsr wp.pdf 2014-03-12 11:10 55K
2002-01-07 monthly progress report-12-31-2001.pdf 2014-03-12 11:19 107K
2002-01-09 rslt of invstgtn in mntrng well MW-71.pdf 2013-12-11 09:35 543K
2002-01-20 notice of 1st qtr 2000 grndwtr sampling.pdf 2014-03-06 11:01 31K
2002-01-22 certification of completion-source cntmnt src.pdf 2014-03-12 11:27 47K
2002-01-23 certification of clean closure.pdf 2014-03-12 11:23 63K
2002-01-28 info request.pdf 2014-03-12 11:30 76K
2002-01-28 lab report-soil sample.pdf 2014-03-12 11:34 422K
2002-01-31 draft source cntmnt sytm oprtn & mtnc manual.pdf 2014-03-12 11:38 55K
2002-02-08 SVE splt air & idpndnt indr air smplng rpt.pdf 2013-12-11 10:09 5.9M
2002-02-12 discharge plan amendment approval.pdf 2014-03-12 11:45 73K
2002-02-15 RCRA post-closure prmt appl..pdf 2013-12-18 09:54 2.4M
2002-02-19 received financial assurance documents.pdf 2014-03-12 11:53 63K
2002-02-26 SVE sample results table.pdf 2014-03-12 12:00 918K
2002-03-12 final report-on site soil vapor extraction system.pdf 2014-03-12 12:02 58K
2002-03-19 grndwtr mntrng report 3rd&4th qtr.pdf 2014-03-12 12:15 1.5M
2002-03-26 request for suplmntl info.pdf 2014-03-12 13:38 142K
2002-04-24 2nd qtr GWMP sampling program.pdf 2014-03-12 13:44 43K
2002-04-25 Extension Request Approval, SI Response to Draft Containment O&M.pdf 2017-04-06 12:59 40K
2002-04-29 draft post-closure care permit.pdf 2014-03-12 13:45 55K
2002-04-29 request for schedule extension-2001 annual report.pdf 2014-03-12 13:48 60K
2002-05-01 agreement to modify schedule-2001 annual report sbmtl.pdf 2014-03-12 13:57 60K
2002-05-03 draft source cntmnt sytm oprtn & mtnc manual.pdf 2014-03-12 13:53 132K
2002-05-07 2001 annual report.pdf 2014-03-14 10:45 14M
2002-05-09 monthly progress report-04-30-2002.pdf 2014-03-12 13:51 87K
2002-05-30 draft source containment.pdf 2014-03-17 07:58 77K
2002-05-31 review-draft post closure care permit.pdf 2014-03-17 08:16 35K
2002-06-03 consent decree.pdf 2014-03-17 11:31 229K
2002-06-06 monthly progress report-05-31-2002.pdf 2014-03-17 08:18 95K
2002-06-11 RSI draft source contmnt sytm oprtn & mtnc mnl.pdf 2013-12-13 10:33 9.4M
2002-06-13 draft fact sheet.pdf 2014-03-17 11:37 267K
2002-06-18 intnt to issu pst-clsr care prmt.pdf 2013-12-11 10:31 2.0M
2002-06-21 affidavit of publication - Santa Fe New Mexican.pdf 2014-03-18 08:15 142K
2002-06-21 Affidavit of Publication-Abq journal.pdf 2014-03-18 08:10 165K
2002-06-25 draft source system oprtn & matnc mnl appvl.pdf 2014-03-18 08:19 63K
2002-06-28 annual unit audit-2001.pdf 2014-03-18 08:29 111K
2002-07-17 notice of dispute.pdf 2014-03-18 08:53 69K
2002-07-18 2001 annual report EPA-NMED comments.pdf 2014-03-18 08:55 69K
2002-07-22 response to USEPA-NMED comments.pdf 2014-03-18 09:01 100K
2002-07-31 Receipt of check for 2000 AUA.pdf 2014-03-18 09:07 29K
2002-08-05 Comments on Draft Post closure Care Permit.pdf 2014-03-18 09:16 155K
2002-08-08 Monthly Progress Report for Month Ending July 31, 2002.pdf 2014-03-18 09:32 97K
2002-08-14 Receipt of check for 2001 AUA.pdf 2014-03-18 10:01 30K
2002-08-15 draft post-closure care prmt & issues in dispute.pdf 2014-03-18 10:05 35K
2002-08-29 Construction Diagram & Sample Log.pdf 2014-03-18 10:11 377K
2002-09-05 Comments & Dispute on Draft Post closure Care Permit.pdf 2014-03-18 10:17 180K
2002-09-06 monthly progress report-08-31-2002.pdf 2014-03-18 10:29 95K
2002-09-16 Extension of Informal Period for Resolving Dispute.pdf 2014-03-18 11:13 42K
2002-09-16 lttr in suprt use of financial test to demnstrt financial assurance.pdf 2014-03-18 11:04 549K
2002-09-18 Revised Part A Permit Application.pdf 2014-03-18 11:25 828K
2002-09-23 Settlement Agreement and CO.pdf 2014-03-18 15:40 1.0M
2002-09-24 Capture Analysis for source Containment Well CW-2.pdf 2014-03-18 11:31 700K
2002-09-30 -- 2002 Annual report.pdf 2014-03-18 11:52 1.7M
2002-10-08 gw mntrng 1st&2nd qtr 2002.pdf 2013-12-11 10:42 2.5M
2002-10-10 Monthly Progress Report for September 2002.pdf 2014-03-18 12:34 101K
2002-10-14 Extension of Informal Period for Resolving Dispute.pdf 2014-03-18 14:18 37K
2002-10-31 Financial Assurance EPA-NMED Approval.pdf 2014-03-18 14:54 64K
2002-11-18 Extension of Informal Period for Resolving Dispute.pdf 2014-03-19 08:00 39K
2002-12-09 Monthly Progress report for November 2002.pdf 2014-03-19 08:04 92K
2002-12-11 Extension of Informal Period for Resolving Dispute.pdf 2014-03-19 08:07 36K
2003-01-15 Extension of Informal Period for Resolving Dispute.pdf 2014-03-19 08:11 39K
2003-01-27 gw mntrng 3rd&4th qtr 2002.pdf 2013-12-11 12:39 1.8M
2003-02-06 Monthly Progress report for January 2003.pdf 2014-03-19 08:15 106K
2003-02-10 -- 1st Quarter GWMP Sampling Program.pdf 2014-03-19 08:22 41K
2003-02-14 Extension of Informal Period for Resolving Dispute.pdf 2014-03-19 08:23 41K
2003-02-14 Position Paper - General reporting Requirements Routine GW Monitoring.pdf 2015-08-04 14:33 61K
2003-02-14 source cntmnt sytm oprtn & mtnc mnl.pdf 2013-12-13 08:23 9.5M
2003-03-05 Request for comments on Changes for the AUA for CY 2002.pdf 2014-03-19 08:35 59K
2003-03-12 Extension of Informal Period for Resolving Dispute.pdf 2014-03-19 08:54 40K
2003-03-13 Draft Post Closure Care Permit.pdf 2014-03-19 08:41 58K
2003-04-08 Monthly Report for March 2003.pdf 2014-03-19 08:59 225K
2003-04-17 Extension of Informal Period for Resolving Dispute.pdf 2014-03-19 09:04 38K
2003-04-28 Post closure Care Permit.pdf 2014-03-19 09:02 180K
2003-05-07 Monthly Report for April 2003.pdf 2014-03-19 09:11 85K
2003-05-16 -- 2002 Annual Report.pdf 2013-12-12 11:39 13M
2003-05-19 extension of informal period for resolving dispute.pdf 2014-03-19 09:24 42K
2003-06-10_Monthly_Progress_Rpt_for_Month_Ending_5-31-2003.pdf 2014-03-19 09:39 118K
2003-06-16_Extension_Of_Informal_Period_for_Resolving_Dispute.pdf 2014-03-19 09:41 41K
2003-06-27_Project_Coordinator.pdf 2014-03-19 10:02 49K
2003-06-30 annual unit audit-2002.pdf 2014-03-19 10:17 99K
2003-07-01 invoice for AUA CY 2002.pdf 2014-03-19 10:24 25K
2003-07-01 project coordinator.pdf 2014-03-19 10:22 53K
2003-07-09 monthly progress report-06-30-2003.pdf 2014-03-19 10:27 98K
2003-07-28 gw mntrng 1st&2nd qtr 2003.pdf 2013-12-12 11:54 1.8M
2003-08-07 monthly progress report-07-31-2003.pdf 2014-03-19 10:38 81K
2003-08-22 cnfrmtn rcpt- ck # 214461.pdf 2014-03-19 10:43 31K
2003-08-25 financial assurance estimate.pdf 2014-03-19 10:46 248K
2003-09-09 monthly progress report-08-31-2003.pdf 2014-03-19 10:50 98K
2003-09-15 report of indpndt accts on applng agreed-upon procedures.pdf 2014-03-19 11:48 77K
2003-09-15 use of financial test to demonstrt financial assurance.pdf 2014-03-19 11:15 188K
2003-09-26 -- 2003 Annual Report.pdf 2013-12-12 12:06 2.7M
2003-09-29 post-closure care permit.pdf 2013-12-12 13:43 1.0M
2003-10-08 issuance of a post-closure permit.pdf 2014-03-19 11:28 60K
2003-10-14 region 6 EPAs new crrctv actn prjct mngr.pdf 2014-03-19 11:51 53K
2003-11-07 2002 annual report-EPA NMED comments.pdf 2014-03-19 12:02 72K
2003-11-08 monthly progress report-10-31-2003.pdf 2014-03-19 12:06 123K
2003-11-26 financial assurance EPA NMED approval.pdf 2014-03-19 12:20 45K
2003-12-05 response to EPS-NMED 2002 annual report comments.pdf 2014-03-19 12:26 283K
2003-12-09 monthly progress report-11-30-2003.pdf 2014-03-19 12:29 102K
2003-12-27 extension request-MW71R work plan.pdf 2014-03-19 12:31 105K
2004-01-09 monthly progress report-12-31-2003.pdf 2014-03-19 13:51 78K
2004-01-26 financial assurance EPA-NMED approval.pdf 2014-03-19 14:11 49K
2004-02-02 grndwtr monitoring plan 3rd&4th qtr 2003.pdf 2014-03-19 14:44 1.8M
2004-02-06 monthly progress report-01-31-2004.pdf 2014-03-19 14:15 114K
2004-02-09 grndwtr mntrng plan 3rd&4th qtr 2003.pdf 2014-03-19 15:38 30K
2004-03-03 WP for the Proposed MW71R.pdf 2017-04-06 13:04 177K
2004-03-08 monthly progress report-02-29-2004.pdf 2014-03-19 15:01 96K
2004-03-16 WP for Proposed MW-71R.pdf 2017-04-06 13:00 34K
2004-04-06 monthly progress report-03-31-2004.pdf 2014-03-20 08:02 120K
2004-04-06 request for comments-annual unit audit-2003.pdf 2014-03-20 07:48 100K
2004-04-28 request for extension-2003 annual report sbmtl.pdf 2014-03-20 08:14 59K
2004-05-28 -- 2003 Annual Report.pdf 2013-11-19 11:30 11M
2004-06-30 annual unit audit CY 2003.pdf 2014-03-20 08:19 124K
2004-07-07 monthly progress report-06-30-2004.pdf 2014-03-20 08:31 99K
2004-07-14 change to correspondence lists.pdf 2014-03-20 09:32 43K
2004-07-28 grndwtr mntrng program 1st & 2nd qtr-2004.pdf 2014-03-20 09:46 2.0M
2004-08-06 monthly progress report-07-31-2004.pdf 2014-03-20 10:19 99K
2004-08-09 Receipt of Check for 2003 AUA.pdf 2016-04-27 08:55 25K
2004-08-16 wrk pln prpsd MW71-R pump & treat comments.pdf 2014-03-20 10:24 229K
2004-08-31 financial assurance estimate.pdf 2014-03-20 10:34 307K
2004-09-08 monthly progress report-08-31-2004.pdf 2014-03-20 10:56 76K
2004-09-13 notice of dispute.pdf 2014-03-20 10:50 181K
2004-09-15 use of financial test to demo financial assurance.pdf 2017-04-05 14:50 194K
2004-09-30 monthly progress report-09-30-2004.pdf 2014-03-20 11:24 84K
2004-10-20 GPS-GIS survey.pdf 2014-03-20 12:05 99K
2004-10-20 Minutes of the 10-13-04 Conference Call.pdf 2017-04-06 13:02 39K
2004-12-06 remidial program work plan.pdf 2014-03-20 14:05 563K
2004-12-08 monthly progress report-11-30-2004.pdf 2014-03-20 14:23 86K
2005-01-07 monthly progress report for december 2004.pdf 2014-03-20 14:25 86K
2005-01-28 grndwtr mntrng prgm plan 3rd4th qutrs 2004.pdf 2013-11-19 11:39 2.0M
2005-02-09 Revised monthly progress report-01-31-2004.pdf 2014-03-20 14:35 102K
2005-03-09 monthly progress report-02-28-2005.pdf 2014-03-20 14:41 64K
2005-04-10 monthly progress report-03-31-2005.pdf 2014-03-20 14:46 75K
2005-04-22 request to modify source containment system.pdf 2014-03-20 14:51 194K
2005-04-25 request for comments-annual unit audit-2004.pdf 2014-03-20 14:59 61K
2005-05-02 request for extension-2004 annual report.pdf 2014-03-20 15:02 59K
2005-05-13 monthly progress report-04-30-2005.pdf 2014-03-20 15:06 105K
2005-05-17 e-mail requested extension.pdf 2014-03-20 15:08 33K
2005-05-31 -- 2004 Annual Report.pdf 2013-11-19 12:11 11M
2005-06-07 monthly progress report-04-31-2005.pdf 2014-03-20 15:11 98K
2005-06-13 EPA id deactivation.pdf 2014-03-20 15:13 38K
2005-06-30 annual unit audit-2004.pdf 2014-03-20 15:16 125K
2005-07-09 monthly progress report-06-30-2005.pdf 2014-03-20 15:18 101K
2005-07-21 Notices & Submittals - Address Change.pdf 2014-03-20 15:21 77K
2005-07-22 gw mntrng prgm pln 1st 2nd qtrs 2005.pdf 2013-11-19 12:25 2.2M
2005-08-08 monthly progress report-07-31-2005.pdf 2014-03-20 15:28 107K
2005-08-31 financial assurance estimate.pdf 2014-03-21 07:42 311K
2005-08-31 update of corrective action activities.pdf 2014-03-20 15:35 358K
2005-09-08 monthly progress report-08-31-2005.pdf 2014-03-21 07:44 99K
2005-09-16 use of financial test to demnsrt financial assurance.pdf 2014-03-21 07:48 231K
2005-09-27 -- 2005 Annual Report.pdf 2013-11-26 10:50 3.3M
2005-10-05 monthly progress report-09-30-2005.pdf 2014-03-21 07:50 112K
2005-11-02 remidial program-revised work plan.pdf 2014-03-21 07:54 107K
2005-11-09 monthly progress report-10-30-2005.pdf 2014-03-21 07:52 103K
2005-12-06 monthly progress report-11-30-2005.pdf 2014-03-21 07:56 100K
2006-01-07 monthly progress report-12-31-2005.pdf 2014-03-21 07:59 91K
2006-02-01 grndwtr mntrng prgm pln 3rd-4th 2005.pdf 2013-11-22 10:06 2.8M
2006-02-04 monthly progress report for 1-31-2006.pdf 2014-03-21 08:01 87K
2006-03-03 monthly progress report-02-28-2006.pdf 2014-03-21 08:05 78K
2006-04-07 Monthly Progress Rpt for Month Ending 3-31-2006.pdf 2017-04-06 13:03 28K
2006-04-13 notice of approval-extension for sbmtl of annual report.pdf 2014-03-21 08:09 102K
2006-05-09 monthly progress report-04-29-2006.pdf 2014-03-21 08:11 94K
2006-05-31 -- 2005 Annual Report.pdf 2013-11-22 10:48 11M
2006-06-02 transmittal of data-DFZ well.pdf 2014-03-21 08:35 1.8M
2006-06-08 monthly progress report-05-31-2006.pdf 2014-03-21 08:13 104K
2006-07-09 monthly progress report-06-30-2006.pdf 2014-03-21 08:38 85K
2006-07-17 grndwtr mntrng 1st-2nd qtr 2006.pdf 2013-11-22 11:01 2.5M
2006-08-09 monthly progress report-07-31-2006.pdf 2014-03-21 08:40 75K
2006-08-27 financial assurance estimate.pdf 2014-03-21 08:45 267K
2006-09-07 monthly progress report-08-31-2006.pdf 2014-03-21 08:43 87K
2006-09-15 report of indipendent accountants.pdf 2014-03-21 08:50 105K
2006-09-15 use of financial test to demntrt financial assurance.pdf 2014-03-21 08:47 124K
2006-09-29 -- 2006 Annual Report.pdf 2013-11-26 11:09 4.1M
2006-10-01 TPH screening guidelines.pdf 2013-11-14 21:27 221K
2006-10-08 monthly progress report-09-30-2006.pdf 2014-03-21 08:52 78K
2006-11-09 monthly progress report-10-31-2006.pdf 2014-03-21 08:54 98K
2006-12-06 notice of appeal-2006 annual fee.pdf 2014-03-21 08:56 61K
2006-12-08 monthly progress report-11-30-2006.pdf 2014-03-21 08:59 119K
2007-01-01 2002-2006 fact sheet.pdf 2014-03-21 09:09 206K
2007-01-09 Monthly Progress Report 12-31-2006.pdf 2013-10-29 21:51 121K
2007-01-15 grndwtr mntrng 3rd-4th qtr 2006.pdf 2013-11-25 12:15 3.0M
2007-02-07 monthly progress report-01-31-2007.pdf 2014-03-21 09:17 100K
2007-03-09 monthly progress report-02-28-2007.pdf 2014-03-21 09:19 96K
2007-03-21 notification of change-project coordinator.pdf 2014-03-21 09:22 43K
2007-04-10 monthly progress report 03-31-2007.pdf 2014-03-24 07:48 88K
2007-05-09 monthly progress report 04-30-2007.pdf 2014-03-24 07:53 83K
2007-05-30 -- 2006 Annual Report.pdf 2013-11-25 13:59 12M
2007-06-09 monthly progress report 05-31-2007.pdf 2014-03-24 07:56 85K
2007-07-10 monthly progress report 06-30-2007.pdf 2014-03-24 07:58 82K
2007-08-10 grndwtr mntrng 1st-2nd qtr 2007.pdf 2013-11-25 14:17 2.5M
2007-09-06 monthly progress report 08-31-2007.pdf 2014-03-24 08:00 89K
2007-09-14 use of financial test to dmnstrt financial assurance.pdf 2014-03-24 08:09 403K
2007-09-28 -- 2007 Annual Report.pdf 2013-11-25 15:04 3.6M
2007-10-10 monthly progress report 09-30-2007.pdf 2014-03-24 08:17 95K
2007-11-08 monthly progress report 10-31-2007.pdf 2014-03-24 08:29 101K
2007-12-09 monthly progress report 11-30-2007.pdf 2014-03-24 08:31 90K
2008-01-08 monthly progress report 12-31-2007.pdf 2014-03-24 16:38 89K
2008-01-29 change in project coordinator.pdf 2014-03-24 16:40 39K
2008-02-07 monthly progress report 01-31-2008.pdf 2014-03-24 16:42 84K
2008-03-03 grnwtr mntrng 3rd-4th qtr 2007.pdf 2013-11-25 15:16 1.9M
2008-03-05 monthly progress report 02-29-2008.pdf 2014-03-24 16:44 85K
2008-04-05 monthly progress report 03-31-2008.pdf 2014-03-24 16:46 88K
2008-05-08 monthly progress report 04-30-2008.pdf 2014-03-24 16:48 93K
2008-05-29 -- 2007 Annual Report.pdf 2013-11-25 15:57 16M
2008-06-07 monthly progress report 05-31-2008.pdf 2014-03-24 16:50 90K
2008-07-09 monthly progress report 06-30-2008.pdf 2014-03-24 16:52 98K
2008-08-06 monthly progress report 07-31-2008.pdf 2014-03-24 16:54 99K
2008-08-12 grndwtr mntrng 1st-2nd qtr 2008.pdf 2013-11-25 16:13 2.2M
2008-09-06 monthly progress report 08-31-2008.pdf 2014-03-24 16:57 99K
2008-09-12 use of financial test to demnstrt financial assurance.pdf 2014-03-24 17:05 769K
2008-10-07 monthly progress report 09-30-2008.pdf 2014-03-24 17:07 106K
2008-10-17 post-closure permit.pdf 2014-03-24 17:12 47K
2008-10-22 post-closure permit.pdf 2014-03-24 17:16 466K
2008-10-24 -- 2008 Annual Report to shareholders.pdf 2013-12-03 12:20 4.2M
2008-11-08 monthly progress report 10-31-2008.pdf 2014-03-24 17:19 99K
2008-12-08 monthly progress report 11-30-2008.pdf 2014-03-24 17:21 89K
2008-12-30 2003-2007 annual reports-comments.pdf 2014-03-24 17:25 241K
2008-12-30 Fee Assessment Class 1 Permit Mod.pdf 2009-01-27 09:24 150K
2009-01-09 monthly progress report 12-31-2008.pdf 2014-03-24 17:45 104K
2009-01-27 grndwtr mntrng 3rd-4th qtr 2008.pdf 2013-11-26 11:18 2.5M
2009-02-02 notice of dispute.pdf 2014-03-24 17:48 97K
2009-02-09 monthly progress report 01-31-2009.pdf 2014-03-24 18:00 104K
2009-02-12 response to EPA-NMED comments-2003-2007 annual reports.pdf 2014-03-24 18:23 1.6M
2009-02-20 notice of dispute.pdf 2014-03-24 18:25 62K
2009-02-23 notice of dispute.pdf 2014-03-24 18:04 50K
2009-03-06 monthly progress report 02-28-2009.pdf 2014-03-24 18:06 92K
2009-04-03 monthly progress report 03-31-2009.pdf 2014-03-24 18:28 88K
2009-04-17 notice of dispute-rsltn & extsn for recpt of 2009 annual rprt.pdf 2014-03-24 18:31 92K
2009-05-08 monthly progress report 04-30-2009.pdf 2014-03-24 18:33 99K
2009-05-08 notice of dispute.pdf 2014-03-24 18:42 54K
2009-06-07 monthly progress report 05-31-2009.pdf 2014-03-24 18:44 89K
2009-06-11 -- 2008 Annual Report.pdf 2013-11-26 12:08 14M
2009-07-09 monthly progress report 06-30-2009.pdf 2014-03-24 18:46 85K
2009-08-01 Technical Background Document for Soil Screening Levels Rev 5.0.pdf 2015-09-17 09:32 1.2M
2009-08-03 grndwtr mntrng 1st-2nd qtr 2009.pdf 2013-11-26 14:48 2.4M
2009-08-07 monthly progress report 07-31-2009.pdf 2014-03-24 18:49 85K
2009-08-07 rev1 monthly progress report 07-31-2009.pdf 2014-03-24 18:51 69K
2009-08-12 MW-80 lot approval.pdf 2014-03-25 17:24 38K
2009-09-01 monthly progress report 8-31-2009.pdf 2014-03-25 17:26 93K
2009-09-15 altenatives evaluation report e-mail.pdf 2014-03-25 17:36 30K
2009-09-15 altenatives evaluation report.pdf 2014-03-25 17:28 29K
2009-09-24 alternatives evaluation report.pdf 2014-03-25 17:39 46K
2009-09-30 Assurance of Financial Ability to complete Work.pdf 2014-03-25 17:41 73K
2009-10-06 monthly progress report 09-30-2009.pdf 2014-03-25 17:44 96K
2009-10-15 financial assurance to pay for work.pdf 2014-03-25 18:04 1.0M
2009-10-16 financial assurance to pay for work.pdf 2014-03-25 18:06 64K
2009-10-26 alternatives eval report-2nd extension request.pdf 2014-03-25 18:23 55K
2009-11-06 monthly progress report 10-30-2009.pdf 2014-03-25 18:08 84K
2009-11-25 evltn of atntv sytm & tknlgs for aqfr rstatn.pdf 2013-11-26 15:11 3.5M
2009-12-02 monthly progress report 11-30-2009.pdf 2014-03-25 18:28 89K
2009-12-03 evltn of altntv sytm & tknlgs for aqfr rstrtn.pdf 2013-11-26 15:41 5.0M
2009-12-08 change of address.pdf 2014-03-25 18:40 83K
2009-12-08 Notices & Submittals - address changes.pdf 2014-03-25 18:49 89K
2010-01-08 monthly progress report 12-31-2009.pdf 2014-03-25 19:07 99K
2010-01-28 financial assurance document review-2010.pdf 2014-03-25 23:26 86K
2010-02-02 grndwtr mntrng 3rd&4th qtr 2009.pdf 2013-11-27 08:16 3.9M
2010-02-04 monthly progress report 01-31-20010.pdf 2014-03-25 19:14 93K
2010-03-09 monthly progress report 02-28-2010.pdf 2014-03-25 19:17 99K
2010-03-23 post closure permit.pdf 2014-03-25 19:22 55K
2010-03-26 sentinel well instal wrkpln request.pdf 2014-03-25 20:03 75K
2010-04-07 monthly progress report 03-31-2010.pdf 2014-03-25 20:18 104K
2010-05-04 wp for instlng mntrng well.pdf 2013-11-27 08:59 560K
2010-05-06 monthly progress report 04-30-2010.pdf 2014-03-25 20:23 98K
2010-05-07 approval-2009 annual report extension request.pdf 2014-03-25 21:12 62K
2010-05-25 wp for intlng mntrng well.pdf 2013-11-27 09:12 861K
2010-06-04 approval-wrk pln for instalng mntrng well.pdf 2014-03-25 21:16 69K
2010-06-09 monthly progress report 05-31-2010.pdf 2014-03-25 21:29 109K
2010-06-11 -- 2009 Annual Report.pdf 2013-11-27 10:32 16M
2010-07-09 monthly progress report 06-30-2010.pdf 2014-03-25 21:34 165K
2010-07-15 grndwtr mntrng 1st&2nd qtr 2010.pdf 2013-12-03 13:42 3.3M
2010-07-26 approval -2007-2008 annual reports.pdf 2014-03-25 22:25 1.2M
2010-08-06 monthly progress report 07-31-2010.pdf 2014-03-25 22:27 121K
2010-09-08 monthly progress report 08-31-2010.pdf 2014-03-25 22:29 107K
2010-09-14 revised pages for 2009 annual report.pdf 2014-03-25 22:32 270K
2010-09-15 sampling results-mntrng well MW-80.pdf 2014-03-25 22:39 711K
2010-09-20 Financial Test.pdf 2013-12-03 14:34 6.5M
2010-09-28 approval-2009 annual report.pdf 2014-03-25 22:42 60K
2010-10-06 monthly progress report 09-30-2010.pdf 2014-03-25 22:46 102K
2010-11-08 monthly progress report 10-31-2010.pdf 2014-03-25 22:50 119K
2010-11-15 fact sheet 2007-2009.pdf 2014-03-25 23:00 859K
2010-11-16 combined 2007-2009 fact sheet.pdf 2014-03-25 23:06 597K
2010-12-09 monthly progress report 11-30-2010.pdf 2014-03-25 23:11 118K
2011-01-09 monthly progress report 12-31-2010.pdf 2014-03-25 23:23 94K
2011-02-09 monthly progress report 01-31-2011.pdf 2014-03-25 23:28 111K
2011-02-22 -- 2010 Annual Monitoring Rpt for Discharge Permit DP-1184.pdf 2017-04-06 13:19 4.3M
2011-02-25 gw mntrng 3rd&4th qtr 2010.pdf 2013-12-02 08:06 2.6M
2011-03-02 notice of invocation of dispute resolution.pdf 2014-03-25 23:31 151K
2011-03-08 monthly progress report 02-28-2011.pdf 2014-03-25 23:33 106K
2011-03-29 EPA-NMED response-notice of invocation dispute.pdf 2014-03-25 23:35 96K
2011-04-08 monthly progress report 03-31-2011.pdf 2014-03-25 23:37 99K
2011-04-18 extension request-2010 annual report.pdf 2014-03-26 16:51 80K
2011-05-09 monthly progress report 04-30-2011.pdf 2014-03-25 23:40 98K
2011-05-09 post closure care guarantee.pdf 2014-03-26 16:59 109K
2011-06-03 approval-2010 financial assurance documents.pdf 2014-03-26 17:44 66K
2011-06-09 monthly progress report 05-31-2011.pdf 2014-03-26 17:47 111K
2011-06-20 -- 2010 Annual Report.pdf 2013-12-02 08:56 14M
2011-07-08 monthly progress report 06-30-2011.pdf 2014-03-26 17:49 95K
2011-07-29 grndwtr mntrng 1st&2nd qtr 2011.pdf 2013-12-02 09:08 3.9M
2011-08-06 monthly progresss report 07-31-2011.pdf 2014-03-26 17:51 94K
2011-09-07 monthly progress report 08-31-2011.pdf 2014-03-26 17:53 102K
2011-09-23 2010 annual report approval w-modifications.pdf 2014-03-26 17:55 79K
2011-10-03 Requirements of the Consent Decree.pdf 2013-12-03 15:07 6.7M
2011-10-09 monthly progress report 09-30-2011.pdf 2014-03-26 17:58 113K
2011-10-12 modified fig 6-10 transmittal e-mail.pdf 2014-03-26 18:04 341K
2011-10-12 modified fig 6-10 transmittal.pdf 2014-03-26 18:12 245K
2011-11-07 monthly progress report 10-31-2011.pdf 2014-03-26 18:14 119K
2011-11-22 wrk pln for plgng & abndng 3 mntrng wells & intlng rplcmnt well.pdf 2013-12-02 09:17 922K
2011-12-06 monthly progress report 11-30-2011.pdf 2014-03-26 18:16 121K
2011-12-23 2010 fact sheet approval w-modification.pdf 2014-03-26 18:29 62K
2012-01-09 monthly progress report 12-31-2011.pdf 2014-03-26 22:58 126K
2012-02-03 approval 2010 fact sheet w-revisions.pdf 2014-03-26 23:00 62K
2012-02-03 grndwtr mntrng 3rd&4th qtr 2011.pdf 2013-12-02 09:28 4.0M
2012-02-06 approval w-modifications.pdf 2014-03-26 23:03 61K
2012-02-06 monthly progress report 01-31-2012.pdf 2014-03-26 23:06 113K
2012-03-08 monthly progress report 02-29-2012.pdf 2014-03-26 23:09 118K
2012-04-09 monthly progress report 03-31-2012.pdf 2014-03-26 23:17 104K
2012-05-04 monthly progress report 04-30-2012.pdf 2014-03-26 23:21 113K
2012-05-10 request for extension-2011 annual report submittal.pdf 2014-03-26 23:45 33K
2012-05-18 approval 2011 annual report extension request.pdf 2014-03-27 00:06 69K
2012-06-08 monthly progress report 05-31-2012.pdf 2014-03-27 00:10 100K
2012-06-29 -- 2011 Annual Report.pdf 2013-12-02 10:29 15M
2012-07-09 monthly progress report 06-30-2012.pdf 2014-03-27 00:13 96K
2012-07-25 grndwtr mntrng 1st&2nd qtr 2012.pdf 2013-12-02 10:46 5.7M
2012-08-09 monthly progress report 07-31-2012.pdf 2014-03-27 00:23 116K
2012-08-30 approval-2011 annual report.pdf 2014-03-27 16:17 50K
2012-09-08 monthly progress report 08-31-2012.pdf 2014-03-27 16:19 97K
2012-09-17 Financial assurance.pdf 2013-04-25 23:31 9.8M
2012-10-03 2011 fact sheet approval.pdf 2014-03-27 16:21 52K
2012-11-09 monthly progress report 10-31-2012.pdf 2014-03-27 17:21 131K
2012-12-09 monthly progress report 11-30-2012.pdf 2014-03-27 17:38 122K
2013-01-09 monthly progress report 12-31-2012.pdf 2014-03-27 18:05 94K
2013-01-24 grndwtr mntrng 3rd&4th qtr 2012.pdf 2013-12-02 11:16 3.9M
2013-03-09 monthly progress report 02-28-2012.pdf 2014-03-27 18:07 109K
2013-03-29 MW-47R soil cuttings disposal approval.pdf 2014-03-27 18:10 60K
2013-03-29 RCRA post-Closure prmt rnwl appl.pdf 2013-12-02 11:45 7.6M
2013-04-08 monthly progress report 03-31-2013.pdf 2014-03-27 18:13 104K
2013-05-24 second agreement- modify scheduleds for completion of wrk.pdf 2014-03-27 18:21 152K
2013-06-03 consent decree-second agreement.pdf 2014-03-27 21:06 149K
2013-06-09 monthly progress report 05-31-2013.pdf 2014-03-27 21:11 115K
2013-06-28 -- 2012 Annual Report.pdf 2013-12-03 09:01 12M
2013-07-12 grngwtr mntrng 1st&2nd qtr 20103.pdf 2013-12-03 09:22 3.8M
2013-09-13 approval-2012 annual report.pdf 2014-03-27 21:15 54K
2013-09-24 Financial assurance for closre, post-closre,or CA.pdf 2013-10-02 18:57 9.0M
2013-10-04 approval request to abndn 2 infltrtn ponds.pdf 2014-03-27 21:20 64K
2013-10-09 monthly progress report.pdf 2014-06-19 16:23 124K
2013-10-31 2012 fact sheet approval.pdf 2014-06-19 16:14 41K
2013-11-10 monthly progress report.pdf 2014-06-19 16:21 115K
2013-12-10 monthly progress report.pdf 2014-06-19 16:20 131K
2014-01-10 notification of change of NMED sparton project coordntr.pdf 2014-06-19 16:17 38K
2014-02-18 grndwtr mntrng program-3rd&4th qtr 2013.pdf 2014-03-27 21:44 4.6M
2014-05-20 2013 annual report.pdf 2014-06-19 16:57 7.1M
2014-07-17 semi-annual progres report 1st & 2nd qtr 2014.pdf 2014-10-08 20:06 3.9M
2014-09-06 Monthly Progress Rpt month Ending August 31st, 2014.pdf 2014-09-30 18:32 146K
2014-09-19 Approval 2013 Annual report.pdf 2014-09-30 18:29 46K
2014-09-22 Guarantee for Post Closure Car for FY 2014 - ST.pdf 2014-10-28 20:35 4.4M
2014-10-08 Fax Monthly Progress Rpt for Sept 2014.pdf 2014-10-24 23:55 145K
2014-11-05_Monthly_Progess_Rpt_for_Month_ending_Oct_31st_2014.pdf 2015-04-23 15:16 135K
2014-12-07_Monthly_Progress_Rpt_for_Mnth_Ending_Nov_30th_2014.pdf 2015-04-23 11:23 230K
2015-01-08_Monthly_Progress_Rpt_for_Month_Ending_Dec_31st_2014.pdf 2015-04-23 16:27 160K
2015-02-06_GW_Monitoring_Program_Plan_3rd_&_4th_Qrt_2014.pdf 2015-04-24 12:46 3.4M
2015-02-09_Monthly_Progress_Rpt_for_Month_Ending_Jan_31st_2015.pdf 2015-04-23 16:25 157K
2015-03-07 Monthly Progress Report for Month Ending February 28, 2015.pdf 2015-10-22 16:03 195K
2015-04-06 Monthly Progress Report for Month Ending March 31, 2015.pdf 2015-10-22 16:00 68K
2015-05-08 Monthly Progress Report for Month Ending April 30, 2015.pdf 2015-10-22 16:04 137K
2015-06-30 -- 2014 annual report.pdf 2015-10-27 11:21 8.0M
2015-07-09 Monthly Progress Report for Month Ending June 30, 2015.pdf 2015-10-22 16:05 151K
2015-07-22 GW Monitoring Program Semi Annual Progress Rpt - 1st & 2nd Quarter.pdf 2015-10-27 11:40 4.0M
2015-07-31 Approval 2014 Fact Sheet.pdf 2015-10-22 15:56 39K
2015-08-09 Monthly Progress Report for Month Ending July 31, 2015.pdf 2015-10-22 16:01 106K
2015-08-28 Approval 2014 annual Report.pdf 2015-10-22 15:53 46K
2015-09-03 -- 2015 Fact Sheet.pdf 2015-10-22 15:57 222K
2015-09-09 Monthly Progress Report for Month Ending August 31, 2015.pdf 2015-10-22 15:55 96K
2015-09-25 Financial Test Post Closure Care.pdf 2015-10-27 15:04 3.7M
2015-10-01 -- 2015 Annual Fee.pdf 2015-10-01 07:20 113K
2015-10-03 Monthly Progress Report for Month Ending September 30, 2015.pdf 2015-10-22 16:06 135K
2015-10-16 Approval 2015 Fact sheet.pdf 2015-10-22 15:53 40K
2015-12-09 Monthly Progress Rpt for Month Ending Nov 30th, 2015.pdf 2016-02-03 14:27 45K
2016-01-09 Monthly Progress Rpt for Month Ending December 31st, 2015.pdf 2016-02-05 10:40 44K
2016-02-05 Approval with Mods Request for Approval of Changes to Reporting Requirements.pdf 2016-02-05 10:43 52K
2016-02-05 Monthly Progress Rpt for Month Ending Janaury 31st, 2016.pdf 2016-02-05 10:42 44K
2016-03-09 Monthly Progress Rpt for Month ending February 28th, 2016.pdf 2016-04-27 08:56 42K
2016-04-07 Monthly Progress Report for Month Ending March 31. 2016.pdf 2016-06-23 14:36 41K
2016-04-07 Request for Approval of the Use of Passive Sampling Devices iwthout Site Specific Testing.pdf 2016-10-19 12:10 87K
2016-04-18 Change in Project Coordinator.pdf 2016-04-21 14:26 50K
2016-04-26 O & M Manual Permit Renewal Application Attachment L.pdf 2016-06-23 14:39 207K
2016-05-31 Disapproval Post Closure Permit Renewal Application.pdf 2016-07-08 11:31 62K
2016-06-08 Monthly Progress Report for Month Ending May 31, 2016.pdf 2016-06-23 14:35 324K
2016-06-24 -- 2015_Sparton_Annual_Report.pdf 2016-07-01 08:45 5.6M
2016-07-08 Monthly Progress Rpt for Month ending June 30, 2016.pdf 2016-08-04 09:11 303K
2016-07-13 Revised Post Closure Permit Renewal Application.pdf 2016-07-19 12:30 5.5M
2016-08-10 Monthly Progress Rpt for Month Ending July 31st, 2016.pdf 2016-10-19 12:07 291K
2016-09-10 Monthly Progress Rpt for Month Ending August 31st, 2016.pdf 2016-10-19 12:08 341K
2016-09-21 Request for Approval of the Use of Passive Sampling Devices without Site Specific Testing.pdf 2016-10-19 12:03 41K
2016-10-03 -- 2016 Annual Fee.pdf 2016-11-08 11:03 306K
2016-10-10 Financial Assurance to Pay for work under the Consent Decree.pdf 2016-10-12 09:07 560K
2016-10-10 Monthly Progress Rpt for Month Ending September 30th, 2016.pdf 2016-10-19 12:05 368K
2016-11-10 Monthly Progress Rpt for Month ending October 31, 2016.pdf 2016-11-10 13:22 367K
2016-11-10 Request for Approval of the use of Passive Sampling Devices without Site Specific Testing.pdf 2016-12-06 09:45 26K
2016-11-29 Approval with Conditions 2015 Annual Report.pdf 2017-01-05 10:44 49K
2016-12-09 Monthly Progress Rpt for Month Ending November 30, 2016.pdf 2017-01-25 16:07 371K
2016-12-19 Updated Maps for Revised RCRA Post Closure Permit Renewal app.pdf 2017-03-23 11:30 7.9M
2017-01-10 Approval with Conditions 2015 Annual Report.pdf 2017-01-19 12:48 41K
2017-02-10 Monthly Progress Rpt fot Month Ending January 31, 2017.pdf 2017-03-23 11:34 773K
2017-02-22 Permit Renewal Application Revised Maps 1 - 4.pdf 2017-03-23 11:29 6.8M
2017-02-27 Updated Facility Map 1 of the Revised Post Closure Pemrit Renewal Permit App.pdf 2017-03-23 11:23 39K
2017-03-10 Monthly Progress Rpt for Month Ending February 28th, 2017.pdf 2017-04-05 17:05 848K
2017-04-10 Monthly Progress Rpt for Month Ending March 31, 2017.pdf 2017-05-11 08:36 300K
2017-05-10 Monthly Progress Rpt for Month Ending April 30, 2017.pdf 2017-05-11 08:37 354K
2017-06-06 Monthly Progress Rpt for Month Ending May 31st, 2017.pdf 2017-07-12 15:35 564K
2017-06-20 Results of 1,4-Dioxane Analyses.pdf 2017-07-12 15:42 931K
2017-06-23 -- 2016 Annual Report.pdf 2017-07-11 10:17 9.9M
2017-07-10 Monthly Progress Rpt for Month ending June 30th, 2017.pdf 2017-07-12 15:38 660K
2017-07-21 Inspection Forms.pdf 2017-08-03 08:02 29K
2017-07-21 Request made for Inspection List.pdf 2017-08-03 08:01 15K
2017-08-10 Monthly Progress Rpt for Month Ending July 31, 2017.pdf 2017-09-22 12:11 289K
2017-09-10 Monthly Progress Rpt for Month Ending August 31, 2017.pdf 2017-09-22 12:12 295K
2017-09-26 Financial Assurance for Post Closure Care for FY 2017.pdf 2017-10-04 09:13 2.1M
2017-10-03 -- 2017 Annual Fee.pdf 2017-11-07 15:00 223K
2017-10-08 Monthly Progress Rpt for Month ending November 30, 2017.pdf 2017-12-15 13:34 72K
2017-10-10 Monthly Progress Rpt for Month Ending September 30, 2017.pdf 2017-10-27 15:35 281K
2017-10-17 Approval with Conditions 2016 Annual Report.pdf 2017-10-27 15:33 58K
2017-11-10 Monthly Progress Rpt for Month ending October 31, 2017.pdf 2017-11-14 09:05 455K
2017-11-29 CW-1 Operation & Maintenance Log.pdf 2018-01-17 09:30 228K
2017-12-18 Draft 2017 Fact Sheet - Update on ER Activities Conducted During 2015 & 2016.pdf 2018-01-17 09:33 255K
2018-01-10 Monthly Progress Rpt for Month Ending December 31, 2017.pdf 2018-02-09 11:14 74K
2018-01-16 Approval 2017 Fact Sheet.pdf 2018-02-09 11:15 37K
2018-01-23 Post Closure Care Guarantee.pdf 2018-02-09 11:18 89K
2018-02-08 Approval 2017 Financial Assurance Documents.pdf 2018-02-09 11:16 37K
2018-02-10 Monthly Progress Report for Month Ending January 31, 2018.pdf 2018-07-12 09:59 71K
2018-03-10 Monthly Progress Report for Month Ending February 28, 2018.pdf 2018-07-12 09:57 70K
2018-04-10 Monthly Progress Report for Month Ending March 30, 2018.pdf 2018-07-12 09:28 71K
2018-04-24 Replacement for Well MW-62 with Well MW-47R.pdf 2018-07-12 09:26 242K
2018-05-10 Monthly Progress Rpt for Month Ending April 30, 2018.pdf 2018-07-12 09:27 63K
2018-06-10 Monthly Progress Rpt for Month Ending May 31, 2018.pdf 2018-07-12 09:23 59K
2018-06-13 Disapproval Request for Replacement of Well MW-62 with Well MW-47R.pdf 2018-07-12 09:22 48K
2018-06-15 Extension Request for 2017 Annual Report.pdf 2018-06-26 10:58 38K
2018-06-25 Approval Extension Request for 2017 Annual Report.pdf 2018-07-12 09:21 42K
2018-07-10 Monthly Progress Report for Month Ending June 30, 2018.pdf 2018-07-12 10:05 62K
2018-07-12 -- 2017_Sparton_Annual_Report.pdf 2018-07-19 17:00 22M
2018-07-16 -- 2017 Annual Report - Lab reports.pdf 2018-07-18 09:07 17M
2018-08-07 Monthly Progress Report for Month Ending July 31, 2018.pdf 2018-08-23 16:38 61K
2018-08-29 WP for Plugging & Abandoning Monitoring Well MW-62 and for Installing MW-62R.pdf 2018-09-04 10:32 1.0M
2018-09-05 Replacement Well Construction Diagrams.pdf 2018-11-15 10:33 256K
2018-09-07 Monthly Progress Rpt for Month Ending August 31, 2018.pdf 2018-11-15 10:35 60K
2018-09-13 Approval with Modification 2017 Annual Report.pdf 2018-11-15 10:37 42K
2018-10-04 Monthly Progress Rpt for Month Ending September 30, 2018.pdf 2018-11-15 10:34 63K
2018-10-05 -- 2018 Annual Fee.pdf 2018-10-03 16:04 410K
2018-10-31 Financial Assurance to Pay for Work.pdf 2018-11-08 11:00 671K
2018-11-09 Approval with Mod - 2017 Annual Report.pdf 2018-11-16 09:19 856K
2018-11-09 Approval with Mod - WP for Plugging and Abandoning Monitoring Well MW-62.pdf 2018-11-15 10:36 39K
2018-11-09 Monthly Progress Rpt for Month Ending Oct 31, 2018.pdf 2018-11-14 10:33 106K
2018-11-20 Approval 2018 Fact Sheet.pdf 2019-01-15 16:25 50K
2018-12-10 Monthly Progress Rpt for Month ending November 30, 2018.pdf 2019-01-15 16:27 129K
2019-01-04 Monthly Progress Report for Month Ending December 31, 2018.pdf 2019-01-15 16:43 118K
2019-01-31 Disapproval Financial Assurance Submittal.pdf 2019-02-01 14:51 202K
2019-02-07 Monthly Progress Rpt for Month Ending Jan 31, 2019.pdf 2019-02-14 10:24 112K
2019-02-27 Financial Assurance Submittal.pdf 2019-03-05 14:56 964K
2019-03-07 Monthly Progress Rpt for Month Ending Feb 28, 2019.pdf 2019-04-03 11:26 118K
2019-03-20 Discharge Permit Mod Required for Additional Contaminant.pdf 2019-04-03 11:25 140K
2019-03-25 Completion Rpt for Monitoring Well MW-62 Replacement.pdf 2019-04-02 08:46 4.0M
2019-04-08 Monthly Progress Rpt for Month Ending Mar 31, 2019.pdf 2019-04-09 13:48 115K
2019-04-08 Notification of Regulation Change.pdf 2019-04-09 13:49 91K
2019-04-30 Notice of Dispute.pdf 2019-05-03 15:49 75K
2019-04-30 Request for Discharge Permit Mod & Abatement Plan.pdf 2019-05-10 10:39 48K
2019-05-07 Monthly Progress Rpt for Month Ending April 30, 2019.pdf 2019-05-08 07:43 191K
2019-05-28 Agreement Pursuant to Paragraph 49 of the Consent Decree.pdf 2019-05-31 07:45 94K
2019-06-10 Montly Progress Rpt for Month Ending May 31, 2019.pdf 2019-06-11 07:22 189K
2019-06-13 Disapproval Completion Rpt for Monitoring Well MW-62 Replacement.pdf 2019-06-14 07:55 79K
2019-06-28 -- 2018 Annual Report.pdf 2019-07-02 15:19 50M
2019-07-10 Monthly Progress Rpt for Month ending June 30, 2019.pdf 2019-07-10 17:05 167K
2019-07-25 Remedial Program Proposal for 1,4-Dioxane Sampling.pdf 2019-09-17 08:19 106K
2019-08-06 Approval 2018 Annual Report.pdf 2019-09-17 08:16 62K
2019-08-08 Monthly Progress Report for Month Ending July 31, 2019.pdf 2019-08-09 11:12 185K
2019-08-09 2nd Disapproval Financial Assurance Submittal.pdf 2019-09-17 08:17 207K
2019-08-13 Approval w Mods Remedial Program Proposal for 1,4-Dioxane Sampling.pdf 2019-09-17 08:15 89K
2019-08-23 Response to DP-1184 Mod Request for an Abatement Plan.pdf 2019-08-27 16:17 2.7M
2019-08-26 Cerberus Aquistion & Financial Assurance Analyses.pdf 2019-09-17 08:36 4.5M
2019-08-28 Response to Comments Completion Rpt for Moniotoring Well MW-62.pdf 2019-09-05 12:03 4.0M
2019-09-10 Monthly Progress Report for Month Ending August 31, 2019.pdf 2019-09-10 10:33 180K
2019-10-09 Monthly Progress Report for Month Ending Sept2019.pdf 2019-10-11 15:45 191K
2019-11-05 Monthly Progress Report for Month Ending October 31, 2019.pdf 2019-11-05 10:19 181K
2019-11-15 Post Closure Care Gaurantee FY End June 30, 2019 Financial Assurance.pdf 2019-11-26 13:52 7.6M
2019-12-09 Monthly Progress Report - November 2019.pdf 2019-12-26 11:56 2.9M
2020-01-06 Approval w Modifications - 2019 Fact Sheet.pdf 2020-01-08 14:59 178K
2020-01-07 Monthly Progress Report - December 2019.pdf 2020-01-10 10:14 890K
2020-02-02 Monthly Progress Report - January 2020.pdf 2020-02-05 11:57 143K
2020-03-03 Monthly Progress Report - February 2020.pdf 2020-03-04 08:31 266K
2020-04-08 Monthly Progress Rpt for Month Ending March 31, 2020.pdf 2022-03-04 14:08 107K
2020-04-28 Status Rpt on 1, 4-Dioxane Sampling Events.pdf 2022-03-08 14:48 13M
2020-05-04 Monthly Progress Rpt for Month Ending April 30, 2020.pdf 2022-03-04 15:11 108K
2020-05-15 Fee Assessment Status Rpt 1,4 Dioxane Sapmling Events 4th Qrt 2019 & 1st Qrt 2020.pdf 2022-03-04 15:09 74K
2020-06-08 Monthly Progress Rpt for Month Ending May 31, 2020.pdf 2022-03-04 15:07 103K
2020-06-30 -- 2019 Annual Report.pdf 2022-03-08 15:08 67M
2020-07-08 Monthly Progress Rpt for Month Ending June 30, 2020.pdf 2022-03-04 15:13 114K
2020-08-07 Monthly Progress Rpt for Month Ending July 31, 2020.pdf 2022-03-04 15:06 107K
2020-08-25 Approval 2019 Annual Rpt.pdf 2022-03-04 15:11 62K
2020-09-09 Monthly Progress Rpt for Month Ending Aug 31, 2020.pdf 2022-03-08 11:53 107K
2020-09-22 Fact Sheet - An Update on ER Activities Conducted During 2019.pdf 2022-03-08 12:52 1.6M
2020-10-08 Monthly Progress Rpt for Month Ending Sept 30, 2020.pdf 2022-03-08 11:52 102K
2020-10-26 PCC Guarantee FY End 6-28-2020 Financial Assurance.pdf 2022-03-04 15:04 23M
2020-11-02 Monthly Progress Rpt for Month Ending Oct 31, 2020.pdf 2022-03-04 14:13 99K
2020-11-04 Approval 2020 Fact Sheet.pdf 2022-03-04 14:15 3.6M
2020-12-08 Monthly Progress Rpt for Month Ending Nov 30, 2020.pdf 2022-03-08 11:59 110K
2021-01-05 Monthly Progress Rpt for Month Ending Dec 31, 2020.pdf 2022-03-08 11:46 100K
2021-01-27 Updated Part A Permit Application.pdf 2022-04-11 15:02 59K
2021-01-29 Status Report on 1,4-Dioxane Sampling Events - 3rd & 4th Qrt.pdf 2022-03-04 14:53 29M
2021-02-05 Monthly Progress Rpt for Month Ending Jan 31, 2021.pdf 2022-03-08 11:44 101K
2021-03-03 Monthly Progress Rpt for Month Ending Feb 28, 2021.pdf 2022-03-08 11:43 101K
2021-04-02 Updated Part A Application.pdf 2022-03-08 12:41 4.5M
2021-04-05 Monthly Progress Rpt for Month Ending March 31, 2021.pdf 2022-03-08 11:54 119K
2021-05-05 Monthly Progress Rpt for Month Ending April 30, 2021.pdf 2022-03-08 11:58 117K
2021-06-03 Monthly Progress Rpt for Month Ending May 31, 2021.pdf 2022-03-08 11:56 101K
2021-06-18 Fact Sheet Intent to Issue a Permit.pdf 2022-03-08 12:32 547K
2021-06-18 Notce of Pblic Cmment Priod & Opprtnity to Rqst A Hrng on a Drft Prmt Eng & Span Vrsns.pdf 2022-03-08 12:34 384K
2021-06-18_Draft Permit for Post Closure Care.pdf 2022-03-04 14:42 17M
2021-06-18_Draft-Permit-Fact-Sheet.pdf 2022-02-10 12:52 381K
2021-06-18_Public-Notice Post Closure Draft Permit English & Spanish Versions.pdf 2022-03-04 14:43 384K
2021-06-24 Extension Request for Submittal 2020 Annual Rpt.pdf 2022-03-08 12:18 52K
2021-06-28 Approval Extension Request for Submittal 2020 Annual Rpt.pdf 2022-03-08 12:17 60K
2021-07-08 Monthly Progress Rpt for Month Ending June 30, 2021.pdf 2022-03-08 12:03 93K
2021-07-13 -- 2020 Annual Report.pdf 2022-03-08 15:48 77M
2021-07-22 Fee Assessment 2020 Annual Rpt.pdf 2022-03-08 12:23 76K
2021-08-05 Monthly Progress Rpt for Month Ending July 31, 2021.pdf 2022-03-08 12:06 101K
2021-08-10 Public Notice Re Draft Permit for Post Closure Care English & Spanish Versions.pdf 2022-03-08 12:22 414K
2021-09-02 Monthly Progress Rpt for Month Ending Aug 31, 2021.pdf 2022-03-08 12:08 98K
2021-09-16 Comments on Draft Post Closure Care Permit - sent via email.pdf 2022-03-09 10:32 182M
2021-10-04 Monthly Progress Rpt for Month Ending Sept 30, 2021.pdf 2022-03-08 12:09 97K
2021-10-25 Disapproval 2019 & 2020 Financial Assurance.pdf 2022-03-08 12:15 200K
2021-11-05 Monthly Progress Rpt for Month Ending Oct 31, 2021.pdf 2022-03-08 12:01 106K
2021-12-02 Monthly Progress Rpt for Month Ending Nov 30, 2021.pdf 2022-03-08 11:40 103K
2022-01-05 Monthly Progress Rpt for Month Ending Dec 31, 2021.pdf 2022-03-08 11:34 102K
2022-02-02 Monthly Progress Rpt for Month Ending Jan 31, 2022.pdf 2022-03-08 11:32 95K
2022-03-03 Monthly Progress Rpt for Month Ending Feb 28, 2022.pdf 2022-03-08 11:30 103K
2022-04-04 Monthly Progress Rpt for Month Ending March 31, 2022.pdf 2022-04-05 10:04 372K
2022-05-09 Monthly Progress Rpt for Month Ending April 30, 2022.pdf 2022-05-12 11:50 93K
2022-05-25 Financial Assurance to Pay for Work.pdf 2022-06-08 13:38 620K
2022-06-03 Monthly Progress Rpt for Month Ending 5-31-2022.pdf 2022-06-08 13:30 85K
2022-06-29 -- 2021 Annual Rpt.pdf 2022-07-08 09:59 32M
2022-07-06 Monthly Progress Rpt for Month Ending June 30, 2022.pdf 2022-07-12 10:33 86K
2022-07-20 Fee Assessment 2021 Annual Monitoring Rpt.pdf 2022-07-21 11:23 68K
2022-08-02 Monthly Progress Rpt for Month Ending July 31, 2022.pdf 2022-08-09 11:34 79K
2022-09-06 Monthly Progress Rpt for Month Ending August 31, 2022.pdf 2022-09-15 10:20 80K
2022-10-05 Monthly Progress Rpt for Month ending September 30, 2022.pdf 2022-10-19 10:23 54K
2022-10-06 -- 2022 Annual Fee.pdf 2022-10-13 10:36 73K
2022-11-04 Monthly Progress Rpt for Month Ending October 31, 2022.pdf 2022-11-09 11:42 51K
2022-12-05 Monthly Progress Rpt for Month Ending on November 30, 2022.pdf 2022-12-15 14:50 52K
2023-01-04 Monthly Progress Rpt for Month Ending on December 21, 2022.pdf 2023-01-05 11:41 58K
2023-02-02 Monthly Progress Rpt for Month Ending on January 31, 2023.pdf 2023-02-21 11:49 53K
Server at hwbdocuments.env.nm.gov Port 443